Dual study programme for engineering and management engineering at Wrocław Banking School, Faculty of Economics, Opole (Q92059)

From EU Knowledge Graph
Revision as of 01:07, 25 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 490,014.8352 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Dual study programme for engineering and management engineering at Wrocław Banking School, Faculty of Economics, Opole
Project in Poland financed by DG Regio

    Statements

    0 references
    1,720,768.76 zloty
    0 references
    412,984.50 Euro
    13 January 2020
    0 references
    2,041,728.48 zloty
    0 references
    84.28 percent
    0 references
    1 July 2019
    0 references
    30 June 2023
    0 references
    WYŻSZA SZKOŁA BANKOWA WE WROCŁAWIU
    0 references
    0 references
    Cel główny projektu:Wzrost kompetencji u47 studentów (21K,26M) uczestniczących w edukacji na poziomie wyższym w na WE WSB we Wrocławiu na kierunku LOG i INŻ ZARZ poprzez udział w studiach dualnych odpowiadających potrzebom gospodarki, rynku pracy i społeczeństwa w terminie do30.06.2023. Główne rezultaty i produkty to:-72 ST LOG i INŻ ZARZ, którzy wezmą udział w studiach dualnych -65 ST LOG i INŻ ZARZ, u których wzrosną kompetencjeGrupa docelowa(zgod. z regulaminem konkursu i SZOOP) to:1) 72 studentów kierunków LOG, INŻ ZARZ (32K;40M)2) Wydział Ekonomiczny w OpoluWyższejSzkoły Bankowej we WrocławiuGłówne zadania to:-realizacja studiów dualnych na kierunku Logistyka i Inżyniera zarządzania.Projekt przewiduje wyłącznie opracowanie programów kształcenia i realizację studiów dualnych, czyli kształcenia przemiennego równolegle w formie zajęć dydaktycznych realizowanych w uczelni i zajęć praktycznych odbywanych u pracodawcy, uwzględniających realizację wszystkich efektów kształcenia przewidzianych w programie kształcenia określonego kierunku studiów o profilu praktycznym -KD3.Okres realizacji projektu wynosi co najmniej 24 miesiące i nie przekracza 48 miesięcy -KD5.Maksymalna wartość projektu wynosi dla uczelni kształcących powyżej 12000 studentów (stan na dzień złożenia projektu - 13782 ST) 10 000 000 PLN. W przypadku projektu złożonego przez uczelnie w partnerstwie maksymalna wartość projektu zależy od sumy liczby studentów (jak powyżej) i nie może przekraczać 10 000 000 PLN -KD6. (Polish)
    0 references
    Main objective of the project: an increase in the competences of 47 students (21K, 26M) participating in tertiary level education in the WSB EC in Wrocław for the LOG and NA for management by participating in dual studies responding to the needs of the economy, the labour market and society at 30.06.2023th time. The main results and outputs are: -72 ST LOG and INZ who will be involved in the dual courses of course — 65 ST LOG and of the managers who will increase their competences for target groups (according to the Rules of Procedure of the Competition and the SZOOP): (1) the 72 students of the LOG, Bank of Management (32K; 40M) 2). the Economic Division, in the Opole University of Wrocławia, is responsible for the development of dual training courses for Logistyka and Engineering Studies. the project only provides for the development of dual training courses for Logistyka and Engineering Studies. the project provides for the completion of all the learning outcomes foreseen in the course of study with a practical profile -KD3.The duration of the project is at least 24 months and does not exceed 48 months -KD5.The maximum project value for the education institution above 12000 students (as at the day of the project — 13782 ST) PLN 10 000 000. In the case of a project submitted by universities in the partnership, the maximum value of the project depends on the sum of the number of students (as above) and must not exceed PLN 10 000 000 to KD6. (English)
    0 references

    Identifiers

    POWR.03.01.00-00-DU48/18
    0 references