Reconstruction of road within approximately 5 km of road within national road No 74 from al. 1 May (bridge over the Łabuńka river) to the river street (town of Zamość). (Q85965)

From EU Knowledge Graph
Revision as of 00:29, 25 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 23,115,602.8464 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of road within approximately 5 km of road within national road No 74 from al. 1 May (bridge over the Łabuńka river) to the river street (town of Zamość).
Project in Poland financed by DG Regio

    Statements

    0 references
    81,867,760.08 zloty
    0 references
    19,648,262.42 Euro
    13 January 2020
    0 references
    96,315,011.86 zloty
    0 references
    85.0 percent
    0 references
    19 February 2016
    0 references
    30 November 2022
    0 references
    MIASTO ZAMOŚĆ
    0 references
    0 references

    50°43'16.7"N, 23°15'34.6"E
    0 references
    Przebudowa drogi na odcinku około 5 km w ciągu drogi krajowej nr 74 od al. 1 Maja (most na rzece Łabuńka) do ulicy Szczebrzeskiej (granica miasta Zamość). (Polish)
    0 references
    Reconstruction of road within approximately 5 km of road within national road No 74 from al.1 May (bridge over the Łabuńka river) to the river street (town of Zamość). (English)
    0 references

    Identifiers

    POIS.04.02.00-00-0036/16
    0 references