Hořicko group aqueduco (Q61292)

From EU Knowledge Graph
Revision as of 23:29, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Hořicko group aqueduco
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    26,358,119.4 Czech koruna
    0 references
    1,054,324.78 Euro
    10 January 2020
    0 references
    41,346,069.65 Czech koruna
    0 references
    1,653,842.79 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    30 September 2021
    0 references
    Vodohospodářská a obchodní společnost, a.s.
    0 references
    0 references

    50°26'15.14"N, 15°19'55.52"E
    0 references
    50601
    0 references
    Projekt obsahuje výstavbu dvou přivaděčů a čerpací stanice v ÚV Březovice v oblasti Hořicka a jeho cílem je nalézt řešení pro zajištění dodávky kvalitní pitné vody v odpovídajícím množství. První přivaděč směřuje do skupinového vodovodu Boháňka - ze stávající úpravny v obci Březovice do stávajícího vodojemu v prameništi Na Bahnech, druhý přivaděč je trasován z obce Boháňka do stávajícího vodojemu v obci Doubrava. Celková délka navrženého vodovodu je 8041,5 m. (Czech)
    0 references
    The project involves the construction of two welded terminals and a petrol station at the OIB in the case of Hořicka and aims to find a solution for ensuring the supply of good quality drinking water in adequate quantities. The first connecting point to the Božářika group in the Bohák group, from the existing arrangement in the municipality of Březovice, to the current aquifer of Na Bahnce, the other part of which is being channelled from the municipality of God to the existing water body in Doubrava municipality. The total length of the proposed water supply line is 8 041.5 m. (English)
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/17_073/0007119
    0 references