Construction of a photovoltaic installation in a swimming pool (Q137707)

From EU Knowledge Graph
Revision as of 14:52, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic installation in a swimming pool
Project in Poland financed by DG Regio

    Statements

    0 references
    130,140.5 zloty
    0 references
    31,233.72 Euro
    13 January 2020
    0 references
    185,915.0 zloty
    0 references
    44,619.6 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 March 2016
    0 references
    20 October 2017
    0 references
    BURSZTYN MEDICAL SPA & WELLNESS SANATORIUM UZDROWISKOWE SPÓŁKA CYWILNA E. ŚLEPKO, H. ŚLEPKO, P. ŚLEPKO
    0 references
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznej na dachu budynku basenowego przynależnego do Bursztyn Medical Spa & Wellness Sanatorium Uzdrowiskowe s.c, znajdującego się w Bobolinie, gmina Darłowo, powiat sławieński, województwo zachodniopomorskie. Przedmiotowa instalacja będzie składała się z 135 modułów monokrystalicznych o mocy nominalnej 39,6 kWp, zajmując powierzchnię 236,65 m2, po stronie południowo-wschodniej budynku. Planuje się wytwarzanie energii elektrycznej przez instalację w ilości 33 196 kWh/rok, co pokryje zapotrzebowanie pompy ciepła na energię, która w układzie z kolektorem powietrznym będzie tworzyła hybrydowy układ. Przedmiotowa inwestycja jest zatem powiązana z przedsięwzięciem, które polegało na modernizacji energetycznej budynku dla którego dostarczana jest energia z dofinansowanego źródła. Zakres rzeczowy projektu: -KONSTRUKCJE WSPORCZE (profile nośne, uchwyty nośne, profile solarne, elementy złączne) - MODUŁY FOTOWOLTAICZNE (monokrystaliczne, 135 szt) -FALOWNIKI -ROZDZIELNIA DC ZABEZPIECZENIA, OKABLOWANIE I POZOSTAŁE KOMPONENTY Etapy projektu: W ramach przedmiotowego projektu przewidziano następujące działania i czynności: 1)diagnoza sytuacji obecnej i określenie potrzeb inwestycyjnych na rozpatrywanym obszarze 2)formułowanie projektu, obejmujące przede wszystkim określenie celów, rezultatów, działań, zasobów, harmonogramu, budżetu oraz wszystkich innych elementów tworzących kompletne przedsięwzięcie 3)przygotowanie dokumentacji technicznej (projekt budowlany) niezbędnej do realizacji projektu – zlecenie firmie zewnętrznej 4) 7 / 35 przygotowanie studium wykonalności 5)akceptacja projektu: ocena wniosku zakończona podpisaniem umów o współfinansowaniu projektu 6)przeprowadzenie wyboru wykonawcy, 7)wykonanie robót montażowych i budowlanych, 8)odbiór prac na podstawie protokołu zdawczo-odbiorczego 9)końcowe rozliczenie finansowe projektu, Przedmiotowy projekt ma charakter stacjonarny. (Polish)
    0 references
    The project consists of the construction of a photovoltaic installation on the roof of a swimming pool that is due to the Bursztyn Medical Spa & Wellness Sanatorium Uhealthowss.c, located in Bobolin, the Municipality of Darłowo, the province of Bratislava, the West Pomerania Region. The installation will consist of 135 mono-crystalline modules having a nominal capacity of 39,6 kWp, covering an area of 236.65 m² on the side of the south-east of the building. Electricity generation is planned for an installation of 33 196 kWh/year, which will cover the energy of the heat pump which will form a hybrid system in the system with the air collector system. The investment in question is therefore linked to the project, which consisted of the energy upgrade of the building for which the energy from the subsidised source is delivered. Material scope of the project: — supports (supporting profiles, support profiles, solar profiles, fasteners) — Photovoltaic module (mono-crystalline, 135 unit) -ALOWNKI -RURAL DEVELOPMENT, DC PROTECTION, cabling and other solid components of the project stages: The following activities and activities are foreseen under this project: (1) a diagnosis of the current situation and an identification of the investment needs in the area concerned (2) of the formulation of the project, including in particular the definition of the objectives, results, activities, resources, timing, budget and all other elements of the complete project 3) of the preparation of the technical documentation (construction project) necessary for the implementation of the project — order the external contractor 4) 7/35 to prepare a feasibility study 5), of the project: assessment of the application completed by the signature of co-financing agreements for project 6) selection of the contractor, (7) execution of assembly and construction work, (8) collection of works on the basis of a hand-over protocol (9) final financial settlement of the project, This project is of a stationary nature. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-A093/16
    0 references