Construction of a photovoltaic and heat pump on a sewage treatment plant in Płock (Q137686)

From EU Knowledge Graph
Revision as of 14:52, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 486,614.74559999997 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic and heat pump on a sewage treatment plant in Płock
Project in Poland financed by DG Regio

    Statements

    0 references
    2,027,561.44 zloty
    0 references
    2,385,366.48 zloty
    0 references
    572,487.96 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 April 2016
    0 references
    30 June 2019
    0 references
    GMINA PŁOTY
    0 references
    0 references
    Projekt ma charakter stacjonarny.Teren przeznaczony pod zabudowę zlokalizowany jest w m. Płoty,przy ulicy Koszalińskiej,na terenie oczyszczalni ścieków.Projekt realizowany będzie na obszarze Strategicznej Interwencji (SSW ).Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy 300,16 kW oraz pomp ciepła o mocy 60,10 kW.Energia elektryczna w postaci prądu stałego produkowana przez ogniwa fotowoltaiczne będzie przekształcana przez falowniki na prąd zmienny o napięciu 400V,następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej Wnioskodawcy.Przewiduje się budowę instalacji fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej,na stopach żelbetowych. ETAPY REALIZACJI PROJEKTU: 1.Przygotowanie dokumentacji projektu w tym: mapa do celów projektowych, dokumentacja projektowo-przetargowa, opracowanie studium wykonalności (IV-V 2016r); 2.Budowa instalacji fotowoltaicznej - prace budowlano-instalacyjne, w tym: Przygotowanie terenu pod budowę, Konstrukcja wsporcza pod panele; Moduły i inwertery; Okablowanie; Rozdzielnice i zabezpieczenia elektryczne; Telemechanika i zabezpieczenie; Instalacja uziemiająca i wyrównawcza; Ogrodzenie terenu termin - III-IX 2017; 3.Instalacja pomp ciepła, w tym: instalacja pomp ciepła; wymiana grzejników termin:III-IX 6 / 44 2017r. 4.Nadzór inwestorski i promocja projektu, w tym: nadzór inwestorski, koszty informacji i promocji (zakup i montaż tablic informacyjnej i pamiątkowej) termin:III-IX 2017r. Za realizację projektu odpowiedzialna będzie Gmina Płoty która jednocześnie będzie zarządzała projektem. Do wdrażanie projektu zaangażowany zostanie bezpośrednio Kierownik projektu pełniący obecnie funkcję kierownika Referatu Rozwoju Gospodarczego i Inwestycji Samorządowych. Pozostali członkowie zespołu zarządzającego proj.: Sp.ds. rozliczenia i promocji projektu oraz Sp. ds. zamówień publicznych.Obsługa księgowa projektu prowadzona będzie przez Skarbnika Gminy który współpraco (Polish)
    0 references
    The project is based on the site. the construction site is located in m. the project is located on the site, located in m. the project will be built on the Site of Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed within the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention Area (SSW). the project will be constructed in the area of the Strategic Intervention (SSW). the THE PHASES OF THE IMPLEMENTATION OF THE PROJECT: 1.Preparation of documentation for the project, including: map for project purposes, project/tender documentation, development of a feasibility study (IV-V 2016); 2.Construction of photovoltaic installations — building and installation works, including: Site preparation, structure support for panels; Modules and inverters; Cabling; Switchgear and electrical protection; Telemechanics and security; Earthing and balancing installation; A boundary fence term — III-IX 2017; 3.Heat pumps installation including: installation of heat pumps; replacement of radiators: III-IX 6/44 2017 4.Investor’s supervision and project promotion, including: investment supervision, cost of information and publicity (purchase and installation of plaque and plaque): III-IX 2017 The project will be carried out under the responsibility of the Gmina Planta, which will at the same time manage the project. The Project Manager will be directly involved in the implementation of the project, who is currently head of the Head of Economic Development and Local Government Investment. The other members of the management team proj.: Sp.for project clearing and promotion and the procurement publics.Observing the accounting officer of the project will be carried out by the Treasurer to the Municipality (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-A033/16
    0 references