Reducing greenhouse gas emissions by using renewable energy sources to produce heat and electricity for public utilities at ul. Waleck, 49, in Czaplinksk (Q137673)

From EU Knowledge Graph
Revision as of 14:52, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 395,558.1984 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reducing greenhouse gas emissions by using renewable energy sources to produce heat and electricity for public utilities at ul. Waleck, 49, in Czaplinksk
Project in Poland financed by DG Regio

    Statements

    0 references
    1,648,159.16 zloty
    0 references
    1,939,010.8 zloty
    0 references
    465,362.59 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 October 2018
    0 references
    31 December 2019
    0 references
    GMINA CZAPLINEK
    0 references
    Projekt pn. „Ograniczenie emisji gazów cieplarnianych poprzez wykorzystanie odnawialnych źródeł energii do produkcji ciepła i energii elektrycznej dla obiektów użyteczności publicznej przy ul. Wałeckiej 49 w Czaplinku” zakłada zastąpienie przestarzałej kotłowni gazowej, ogrzewającej kompleks budynków Szkoły Podstawowej w Czaplinku ( Szkoła Podstawowa, Przedszkole, Biblioteka Publiczna) i Hali Widowiskowo – Sportowej w Czaplinku, z wykorzystaniem odnawialnych źródeł energii (pompy ciepła i instalacje fotowoltaiczne). Z uwagi na efektywność kosztową i usprawnienie zarządzania poszczególnymi obiektami dla budynków Szkoły Podstawowej i Hali Widowiskowo-Sportowej zaprojektowane zostały niezależne rozwiązania zasilania energetycznego. 1. Dla budynków Szkoły Podstawowej zaplanowano następujące rozwiązanie: a) wymiana istniejących kotłów gazowych na pompy ciepła z odwiertami (wymienniki gruntowe) o łącznej mocy 250 kW na potrzeby co i cwu. W przypadku zastosowania pomp ciepła konieczne jest drugie źródło ciepła jako źródło szczytowe (przy temperaturach ujemnych poniżej - 5oC) - zainstalowany zostanie nowy kocioł gazowy kondensacyjny o mocy 350 kW, b) modernizacja elementów kotłowni i instalacji grzewczej w budynkach szkoły, c) budowa instalacji fotowoltaicznej na dachach budynków szkoły o mocy 16,2 kWp. 2. Dla budynków Hali Widowiskowo-Sportowej zaplanowano następujące rozwiązanie: a) instalacja pomp ciepła z odwiertami (wymienniki gruntowe) o łącznej mocy 170 kW na potrzeby co i cwu. W przypadku zastosowania pomp ciepła konieczne jest drugie źródło ciepła jako źródło szczytowe (przy temperaturach ujemnych poniżej - 5oC) - zainstalowany zostanie nowy kocioł gazowy kondensacyjny o mocy 250 kW i wykonane przyłącze gazowe. b) modernizacja kotłowni i regulacja systemu grzewczego w budynku hali, c) budowa instalacji fotowoltaicznej o mocy 10,26 kWp dla hali, która będzie zainstalowana na dachu budynku szkoły. (Polish)
    0 references
    The project entitled: “Reducing greenhouse gas emissions by using renewable energy sources to produce heat and electricity for public utilities at ul. Wałbrzych 49 in Czaplinksk, is a replacement of an obsolete gas boiler, a heating complex of the building complex of the Primary School in Czapplink (Primary School, Pre-School, Public Library) and Hali Widowicowo — Suplinku, using renewable energy sources (heat pumps and photovoltaic installations). In view of the cost efficiency and the improvement of the management of the individual sites for the buildings of the Primary School and the Hala Widowick-Sport, independent energy supply solutions have been designed. 1. For the buildings of the Primary School, the following solution is planned: replacement of existing gas boilers for heat pumps with wells (outdoor units) with a total power output of 250 kW for co and CWU. If heat pumps are used, a second source of heat is needed (at negative temperatures below — 5 °C) — a new condensing gas boiler of 350 kW will be installed, b) retrofitting of boiler components and heating facilities in school buildings, c) construction of a 16,2 kWp school photovoltaic installation. 2. The following solution has been planned for the buildings of the Hala Widobisk-Sport: a) installation of heat pumps with wells (outdoor units) with a total capacity of 170 kW for co and CWU. If heat pumps are used, a second source of heat is needed (at negative temperatures below — 5 °C) — a new gas condensing gas boiler with a power output of 250 kW and a gas connected gas connection will be installed. (b) modernisation of the heating system and regulating the heating system in the hall building, (c) construction of a 10,26 kWp of the installation to be installed on the roof of the school. (English)
    0 references

    Identifiers

    RPZP.02.09.00-32-A004/17
    0 references