Construction of a photovoltaic power supply to the Płock Hall (Q137801)

From EU Knowledge Graph
Revision as of 14:49, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic power supply to the Płock Hall
Project in Poland financed by DG Regio

    Statements

    0 references
    226,755.34 zloty
    0 references
    54,421.28 Euro
    13 January 2020
    0 references
    266,771.0 zloty
    0 references
    64,025.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 March 2017
    0 references
    30 June 2019
    0 references
    GMINA PŁOTY
    0 references
    0 references
    Projekt ma charakter stacjonarny. Lokalizacja projektu: Płoty, ul. Koszalińska 2a, działka nr 47, obręb geodezyjny 2 m. Płoty. Projekt realizowany będzie na obszarze Strategicznej Interwencji (SSW). Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy ok. 39,52 Wp – 137 ogniwa fotowoltaiczne o mocy co najmniej 290 Wp każde. Energia elektryczna w postaci prądu stałego prod. przez ogniwa fotowolt. będzie przekszt. przez falowniki na prąd zmienny o napięciu 400V,a następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej Wnioskodawcy. Przewiduje się budowę inst. fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej. Konstrukcja posadowiona będzie na stopach żelbetowych. Oprócz inst. fotowoltaicznej nie przewiduje się wykonania na działce dodatkowej infrastruktury technicznej. ETAPY REALIZACJI PROJEKTU: 1.Przygotowanie dokumentacji projektu w tym: opracowanie studium wykonalności (III 2017r); 2.Budowa instalacji fotowoltaicznej - prace budowlano-instalacyjne, w tym: Konstrukcja wsporcza pod panele; Moduły i inwertery; Okablowanie; Rozdzielnice i zabezpieczenia elektryczne; Telemechanika i zabezpieczenie; Instalacja uziemiająca i wyrównawcza; termin - V-VI 2019; 4.Nadzór inwestorski, w tym: wynagrodzenie inspektora nadzoru (IV-VII 2019r.) Za realizację proj odp. będzie Gmina Płoty która jednocześnie będzie zarządzała projektem. Do wdrażanie projektu zaangażowany zostanie powołany zespół zarządzający - Kierownik proj. i Specjalista ds. zamówień publicznych i rozliczenia projektu. Obsługa księgowa projektu prowadzona będzie przez Skarbnika Gminy. Okr. realiz. projektu: 02.03.2017 do 30.06.2019 r. Rozwiązania techniczne i technologiczne umożliwiają realizację projektu zgodnie z zakładanym harmonogramem. Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania w pełnej funkcjonalności. Gmina Płoty posiada niezbędne zasoby finansowe, techniczne, kadrowe oraz doświadczenie gwarantujące prawidłową realizację projektu. (Polish)
    0 references
    The project is stationary. Location of the project: Fences, ul. Koszalin 2a plot No. 47, geodesic zone 2 m. The project will be implemented in the Strategic Intervention Area (SSW). The object of the project is the construction of a photovoltaic power plant of ca. 39,52 Wp — 137 photovoltaics power of at least 290 Wp each. The electricity in the form of DC power plants will be passed by the wave cells to 400V alternating current and then via a transformer network into the applicant’s electricity grid. The construction of a engineered photovoltaic unit is to be constructed on a free-standing steel construction. The design shall be based on gelatinous feet. In addition to the PV, no additional technical infrastructure is expected to be executed on the parcel. THE PHASES OF THE IMPLEMENTATION OF THE PROJECT: 1.Preparation of documentation for the project, including: feasibility study (III 2017); 2.Construction of photovoltaic installations — building and installation works, including: The structure of the supports under the panels; Modules and inverters; Cabling; Switchgear and electrical protection; Telemechanics and security; Earthing and balancing installation; the term — V-VI 2019; 4.Investment surveillance, including: the remuneration of the supervisor (IV-VII 2019) For a proj odl will be the Gmina Planta, which will at the same time manage the project. In order to implement the project, a management team, the Head of the Public Procurement and the Specialist Procurement and Project Settlement, will be involved. The accounts of the project will be carried out by the local authorities. The project (s) on which the project is based: 02.03.2017 by 30.06.2019, technical and technological solutions enable the project to be carried out in accordance with the planned timetable. Once the investment has been carried out, the infrastructure will be ready to be used in full functionality. The Municipality has the necessary financial, technical, human and experience resources to guarantee the correct implementation of the project. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B182/17
    0 references