“Extension of rainwater drainage systems in the municipality of Dziwnów” (Q137854)

From EU Knowledge Graph
Revision as of 14:44, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Extension of rainwater drainage systems in the municipality of Dziwnów”
Project in Poland financed by DG Regio

    Statements

    0 references
    2,036,819.74 zloty
    0 references
    488,836.74 Euro
    13 January 2020
    0 references
    2,396,258.52 zloty
    0 references
    575,102.0448 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 July 2019
    0 references
    31 December 2020
    0 references
    GMINA DZIWNÓW
    0 references
    W wyniku realizacji projektu długość kanalizacji deszczowej na terenie gminy Dziwnów zwiększy się o 0,97 km. ZBIORNIK RETENCYJNY WOD OPADOWYCH. Zostanie wykonany na terenie zielonym w sąsiedztwie ul. Parkowej (wraz z zagospodarowaniem terenu zbiornika) Wyposażony zostanie w: urządzenia podczyszczające, instalację do podlewania zieleni na terenie parku oraz dwie pompy zatapialne do przepompowywania nadmiaru wód oraz rurociągu tłocznego nadmiaru wód do studzienki rozprężnej na kanale deszczowym. KANALIZACJA DESZCZOWA: wykonanie nowej kanalizacji, przełożenie odcinka kanału, wymiana pomp w przepompowni, wykonanie instalacji elekt., monitoringu, odtworzeni nawierzchni dróg i chodników. (Polish)
    0 references
    As a result of the project, the length of the storm water system in the municipality of Dziwnów will be increased by 0.97 km. RAINWATER SPRAY TANK. It will be made in a green area in the vicinity of the street. The Parkowa (including the management of the container area) shall be equipped with: cleaning devices, a green park installation in the park area and two floodable pumps for pumping the excess water and an excess water pipe to the well over the rain channel. STORM WATER DRAINAGE: construction of the new sewage system, transmission of a section of the channel, replacement of pumping stations in the pumping station, installation of the installation, monitoring, replacement of road surfaces and pavements. (English)
    0 references

    Identifiers

    RPZP.03.03.00-32-B009/18
    0 references