Extension, reconstruction of the A3 Brigade of the Regional Specialist Hospital in Olsztyn at ul. 18a and the purchase of equipment in order to adapt it to the needs of multi-petal comprehensive treatment of children (Q132810)

From EU Knowledge Graph
Revision as of 13:49, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 3,549,323.0015999996 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension, reconstruction of the A3 Brigade of the Regional Specialist Hospital in Olsztyn at ul. 18a and the purchase of equipment in order to adapt it to the needs of multi-petal comprehensive treatment of children
Project in Poland financed by DG Regio

    Statements

    0 references
    14,788,845.84 zloty
    0 references
    18,430,765.0 zloty
    0 references
    4,423,383.6 Euro
    13 January 2020
    0 references
    80.24 percent
    0 references
    5 January 2016
    0 references
    30 June 2020
    0 references
    WOJEWÓDZKI SPECJALISTYCZNY SZPITAL DZIECIĘCY IM. PROF. DR STANISŁAWA POPOWSKIEGO W OLSZTYNIE
    0 references
    0 references

    53°46'36.1"N, 20°28'40.1"E
    0 references
    Projekt zostanie wdrożony przez Wnioskodawcę -Wojewódzki Specjalistyczny Szpital Dziecięcy im. prof. S. Popowskiego w Olsztynie. Zakres rzeczowy projektu: • prace przygotowawcze i projektowe • przygotowanie terenu • kompleksowa przebudowa wnętrza bryły A3 • rozbudowa pozioma bryły A3 • nadbudowa o 1 kondygnację bryły A3 oraz łącznika z bryłą B • roboty instalacyjne • zagospodarowanie terenu • zakup wyposażenia W docelowej bryle A3 znajdą się: Oddział Intensywnej Terapii i Anestezjoligii, Oddział Pediatryczny V Chorób Zakaźnych, Oddział IV Wielospecjalistyczny, Oddział Chorób Układu Kostno-Stawowo-Mięśniowego w zakresie Ortopedyczno-Urazowym oraz w zakresie Pediatryczno-Reumatologicznym. Lokalizacja: działka nr 38, ul. Żołnierska 18a, Olsztyn. Etapy realizacji projektu: 1. Opracowanie koncepcji projektu 2. Opracowanie dokumentacji projektowej 3. Opracowanie Studium Wykonalności 4. Wyłonienie inwestora zastępczego 5. Wyłonienie wykonawcy robót budowlanych i dostawcy wyposażenia 6. Roboty budowalne 7. Zakup Wyposażenia 8. Promocja projektu 9. Rozliczenie projektu Projekt jest zgodny z zapisami SzOOP 9.1.1 RPO WIM -zgodny jest z celem szczegółowym tj. Polepszenie jakości i skuteczności usług zdrowotnych-Projekt polega na podniesieniu jakości usług oferowanych przez Wnioskodawcę poprzez wzrost efektywności pracy, polepszenie warunków pobytu pacjentów, polepszenie warunków pracy. Wnioskodawca jest typem beneficjenta wskazanym w SzOOP-Samodzielny Publiczny Zakład Opieki Zdrowotnej. Grupę docelową stanowią pacjenci. Projekt wpisuje się w schemat C-tj. – inwestycje w obiekty i zakup wyposażenia poprzez rozbudowę, nadbudowę bryły A3 oraz zakup wyposażenia. Wkład własny wynosi 19,76%. Wnioskodawca posiada umowę na świadczenie usług opieki zdrowotnej fin. w ramach publicznej opieki zdrowotnej (Polish)
    0 references
    The project will be implemented by the Applicant — Regional Specialist Hospital of Professor S. Popowski in Olsztyn. Material scope of the project: • preparatory and design work• preparation of the site• Preparation of the site• Preparation of the site• Comprehensive reconstruction of the interior of the bride A3• extension of the horizontal A3 brim• construction by 1 floors of the A3 Brigade and the connector with firm B• Installation work• Installation of the site• purchase of equipment to the target group A3 will be: The Therapeutic Point and the Anstezisiolgia Branch of the Paediatric Branch V Infectious Diseases and Branch IV of the Plurilateral Special Diseases Division, the Ortopedio-Injury Disease Department and for the Paediatric and Restoration Division. Location: plot No 38, ul. 18a, Olsztyn, Olsztyn. The phases of the implementation of the project: 1. Development of project concept 2. Preparation of project documentation 3. Development of a feasibility study 4. Identification of a replacement investor (5). Selection of the contractors for the construction work and the suppliers of equipment 6. Construction work 7. Purchase of 8 equipment. Project promotion 9. The draft proposal is in line with the provisions of the OOP 9.1.1 ROP WIM, which is in line with the specific objective, i.e. Improving the quality and effectiveness of health services — the project is to improve the quality of services offered by the Applicant by increasing the efficiency of the work, improving the conditions for patients, and improving working conditions. The applicant is a beneficiary type designated in the SzOP-Samotny Public Health Care Centre. The target group is patients. The project is part of the C-tj diagram. — investments in facilities and equipment acquisition through extension, building of the A3 brigade and purchase of equipment. The own contribution amounts to 19.76 %. The applicant has a contract for the provision of health care services in the framework of public health care. (English)
    0 references

    Identifiers

    RPWM.09.01.01-28-0006/17
    0 references