Modernisation of the multifunctional sports field at the Minsk Primary School (Q132908)

From EU Knowledge Graph
Revision as of 13:38, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 197,302.00559999997 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the multifunctional sports field at the Minsk Primary School
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    822,091.69 zloty
    0 references
    990,591.27 zloty
    0 references
    237,741.9 Euro
    13 January 2020
    0 references
    82.99 percent
    0 references
    17 May 2017
    0 references
    28 September 2018
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    W skład Zespołu Szkół w Grabowie wchodzą: - Szkoła Podstawowa im. Michała Kajki w Grabowie, - Samorządowe Gimnazjum w Grabowie. W ramach projektu planuje się wykonać na działce nr 118 obr. Grabowo: Boisko wielofunkcyjne - wymiary 33,6x60,5 m. Nawierzchnia ze „sztucznej trawy” o wysokości 20 mm na podbudowie zgodnie z przekrojami boiska i infrastr. towarzyszącą.W skład boiska o którym mowa wchodzą: boisko do piłki nożnej o wymiarach 30x56 m, 2 boiska do siatkówki o wymiarach 9x18 cm, boisko do piłki ręcznej o wymiarach 20x30 m, boisko do koszykówki 15x28 m. Dane liczbowe boiska: a) Powierzchnia zabudowy 2032,80 m2. b) Powierzchnia do gry (czynna) 1680,00 m2. c) Powierzchnia trawiasta 2032,80 m2. d) Powierzchnia całkowita 2032,80 m2. Szczegółowe informacje na temat zakresu rzecz. i przyjętych rozwiązań znajduje się w rozdz. 2.2 studium oraz w wyciągu z dokum. techn. będącej załącz. do wniosku. Cały zakres inwestycji wdrażany będzie przez benefic., tj. Gminę Gołdap, która wyodr. ze swej struktury zespół pracowników odpowiedz. za wdrożenie projektu, którzy posiadają wysokie kwalifikacje i doświadcz. w realizacji projektów wdroż. w latach 2007-2013, co potwierdza rozdział 2.3 studium. Realiz. projektu podzielona została na następujące elementy:roboty budowlane, studium wykonalności, promocja projektu, Nadzór inwestorski. Beneficjent posiada pełną zdolność realizacyjną do prawidłowej realizacji projektu zgodnie z zapisami kryteriów w tym zakresie. Poprzez zaprop. rozwiąz. projekt w najwyższym stopniu odpow. założeniom SzOOP RPO WiM 2014-2020, gdyż zakłada moderniz. przyszkolnej infrastruktury sportowej umożliw. prow. różnorodnych zajęć sportowych (r. 1.3 sw). Interesariuszami projektu są przede wszystkim dzieci i młodzież –nauczyciele, personel placówki, etc. Infrastr. (wielof. boisko sportowo - rekreacyjne) dostępne będzie dla 353 uczniów Zespołu Szkół w Grabowie w zakresie zajęć lekcyjnych jak rónież dodatk. zajęć pozalekc. (Polish)
    0 references
    The Group of Schools in Grabowie consists of: School Primary School made up of Graboów Primary School in Grabowie. Within the project, the project is planned to be carried out on plot No 118. Grabowo: The multifunctional field — dimensions of 33,6x60.5 m. artificial grass surface with a height of 20 mm under construction in accordance with the pitches and infraspecific areas. a football field with dimensions of 30x56 m, 2 volleyball fields measuring 9x18 cm, a handball field with dimensions of 20x30 m, pitch to basketball pitch 15x28 m. (a) Surface of a construction of 2 032.80 m². (b) Game area (active) 1 680.00 m² (c) grassland and 2 032.80 m². (D) Total area 2 032.80 m². For details of the scope and solutions, see 2.2 of the study and the accompanying extract to the proposal. The entire range of investments will be implemented by the beneficiaries. The municipality of Gołdap, a team of staff deployed from its structure, will vent for the implementation of the project, who are highly qualified and experienced in the implementation of the projects implemented. in 2007-2013, as confirmed by chapter 2.3 of the study. The project was divided into the following elementy:roboty construction, feasibility study, project promotion, investment supervision. The beneficiary shall have full capacity to implement the project in accordance with the criteria in this respect. A proposal has been made to the extent that the project will take the utmost account of the assumption of the 2014-2020 ROP MP for the purpose of implementing the upgrading of sports infrastructure in order to allow for a variety of sporting activities (1.3 of them). Project stakeholders are primarily children and young people — teachers, staff of the facility, etc. Infrastructure. (multi-f. sports, recreational sports) will be available for 353 classes of school pupils in Grabowie in classes as well as the addition of extra-curricular activities. (English)
    0 references

    Identifiers

    RPWM.09.03.04-28-0020/17
    0 references