“Security of defence walls” (Q132770)

From EU Knowledge Graph
Revision as of 13:37, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 217,075.6752 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Security of defence walls”
Project in Poland financed by DG Regio

    Statements

    0 references
    904,481.98 zloty
    0 references
    1,182,329.39 zloty
    0 references
    283,759.05 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    7 April 2017
    0 references
    30 April 2019
    0 references
    GMINA MIEJSKA LIDZBARK WARMIŃSKI
    0 references
    0 references

    54°7'50.2"N, 20°33'53.6"E
    0 references
    Przedsięwzięcie realizowane będzie w Lidzbarku Warmińskim, ul. Dębowa i pl. Kościelnym (działki nr: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157 obr.7.). Zakres projektu: 1) remont muru na ul. Dębowej, w tym przemurowanie i odbudowa fragmentów muru, uzupełnienie ubytków i spoin, naprawa spękań lica muru, wymiana betonowych czap zwieńczenia muru na ceglane, usunięcie zieleni, wykonanie opaski z kostki kamiennej wzdłuż podstawy muru. 2) remont muru na ul. Plac Kościelny, w tym przemurowanie i odbudowa fragmentów muru, uzupełnienie ubytków i spoin, naprawa spękań lica muru, naprawa i uzupełnienie ceglanych zwieńczeń muru, rozebranie i ponowne wymurowanie zawalonego i zniszczonego odcinka muru ze wzmocnieniem konstrukcji fundamentu oraz odbudowa zawalonej drogi kościelnej i wykonanie odwodnienia liniowego. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z konk. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: -podpisanie umowy -realizacja prac -odbiór końcowy i podpisanie prot Projekt wpisuje się w SZOOP RPO WWM realizując cel: „Lepsza jakość życia społeczności zamieszkujących obszary problemowe”. Z projektu będą mogli korzystać wszyscy Interesariusze w tym mieszkańcy zamieszkujący teren zdegradowany. Projekt uporządkuje przestrzeń społeczną przez co wzmocni również potencjał turystyczny, mury zlokalizowane są w ciągu spacerowym pomiędzy Kościołem pw. św. Piotra i Pawła a Wysoką Bramą oraz w bezpośrednim sąsiedztwie Bulwaru nad Łyną. (Polish)
    0 references
    The project will be carried out by ul. Oak and plume Ecclesiastical (parcels No: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157 to.7.). Scope of the project: 1) renovation of the wall at ul. The hermit beetle, including the reconstruction and reconstruction of the wall of the wall, completion of loss and weld, repair of the wall fracture of the wall, concrete replacement of the wall on the brick, removal of greenery, construction of the swollen stone along the wall of the wall. 2) renovation of the wall at ul. The Church of Kościelny, including the reconstruction and reconstruction of parts of the wall, completion of loss and weld, repair of the wall fracture of the wall, repair and demolition of the wall of the wall, reassemble and force the wall to rebuild the wall with a foundation structure and reconstruction of the walker and the restoration of the wall. The phases of the implementation of the project: — the request for the DOF. Signature of the contract for the DOF. The contractor’s selection in accordance with the contract. Conclusion of the contract with the contractor and start of works, in accordance with the planned timetable — completion of the project and signature of the final protocol, final bill of bill settlement: Signature of the contract — delivery of works — final acceptance and signature of the project is part of the SZOOP ROP WWM, pursuing the objective of: “Better quality of life for communities in problem areas”. The project will be open to all stakeholders including residents living in degraded land. The project will streamline the social space so that it will also strengthen the tourism potential, walls are located in a walk of space between the Church of Saint Martin. Piotr and Pavel and he or she will be in the immediate vicinity of the continent and in the immediate vicinity of the continent. (English)
    0 references

    Identifiers

    RPWM.08.01.00-28-0028/17
    0 references