Thermal modernisation of the public building at ulica Kościuszki 2 in Ostróda. (Q132250)

From EU Knowledge Graph
Revision as of 13:34, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the public building at ulica Kościuszki 2 in Ostróda.
Project in Poland financed by DG Regio

    Statements

    0 references
    833,515.97 zloty
    0 references
    200,043.83 Euro
    13 January 2020
    0 references
    1,227,925.7 zloty
    0 references
    294,702.17 Euro
    13 January 2020
    0 references
    67.88 percent
    0 references
    22 December 2016
    0 references
    30 November 2019
    0 references
    POWIAT OSTRÓDZKI Z SIEDZIBĄ W OSTRÓDZIE
    0 references
    0 references

    53°42'10.1"N, 19°57'46.4"E
    0 references
    Proj.realizowany będzie w Ostródzie, p.ostródzki, woj. warm-maz. Wnioskodawca jest Powiat Ostródzki. Przed.proj. to kompleks.termomodernizacja budynku użyteczności publicznej - w przew. zakresie wykorzystany na cele ochrony zdrowia.Właśc.budynku jest Wnioskodawcą i usytuowany jest przy ul.Kościuszki 2, na działce nr 146 /5 . Objęty proj. budynek o wysokim st.zapotrzebowania dla społ. lok.powiatu ostródzkiego ze względu na umiejscowienie w nim wielu instytucji, gł.z zakresu ochrony zdrowia.Gł.problemem stanowiącym przedmiot planowanego proj. jest brak wolnych środków finans.na termomodernizację budynku oraz jego niski standard energetyczny. Powiat, dokonał analizy potrzeb interesariuszy, z której wynika szereg potrzeb w zakresie termomodernizacji obiektu, użytkowany rocznie przez ponad 170 tys.osób,najbardziej zainter.grupą oprócz Wnioskodawcy,to najemcy powierz. i ich pracownicy, pacjenci i osoby im tow., którzy korzystają z budynku. Zakres prac: piwnica(ociepl.ścian przy gruncie i nad gruntem,wykon.tynków,malow.tynk.) parter(przyg.podłoż.,osusz..ścian,uzupeł.tynków,ociepl.śc.styrop.,wyk.tynków,malow.tynków) I,II,III pietro (przyg.ścian.,uzup.tynk.,ociepl.ścian styrop.,wykon.tynk.,malow.tynków) dach(demont.orynnow.,napr.komin.,izolacje przeciw wil.bitum.) wymiana parapetów zew.i krat. Wyk. ocieplenia ścian wew. Dociepl.stropu nad piwnicą pokrycie dach.,izolacją cieplna , inst. Odgromowa . opaska wokół budynku rob.dem.i napraw.(dem.grzej,żeliwn.,demont.rurociągu stalow.w bud.) rob.montaż.(montaż now.grzjen.płyt.,montaż now.ruroc.,montaż zaw.i izolacji) W proj.zostaną także zrealizowane takie zad jak: promocja proj., nadzór inwestorski oraz zarządzanie cyklem projektu. Zostanie powołany zostanie. zespół proj.Stosowane będzie prawo PZP. Cele proj. są zgodne z SZOOP RPO WiM, Oś 4 Efektywność energetyczna Priorytet inw.4c - w wyniku realizacji proj. poprzez kompleks.termomodernizację nastąpi zmniejszenie.emisji CO2 w budynku o 54,75 % (Polish)
    0 references
    The Proj.will be implemented in the Ostróda, a maz-maz area. The applicant is a District of the District. This is a complex thermal modernisation of the public building — in the light of the scope used for the protection of the health of the public and the beauty of the building is the applicant and is located at 2 Kościuszki, on plot No 146/5. In the form of a high location building in which the district of the district of the district is located due to the location of a large number of the districts in which the district is located, in view of the location of many institutions, the head for the protection of health, the problem being planned is the lack of free funding for the thermal refurbishment of the building and its low energy standard. The District has analysed the needs of stakeholders, which shows a number of needs in terms of thermo-modernisation of the site, which are used annually by more than 170 people, the most important one, apart from the Applicant, are tenants and their employees, patients and their users who use the building. Scope of work: the basement (covering walls on land and on the ground and on the ground and on the ground and on the ground and on the ground and on the ground and on the ground, etc., for walls, toppings, etc., for wall insulation, etc. The wall warming of the walls in the field. Thermal insulation of the roof, covering the roof., thermal insulation, against. Packaging around a bu.dem building and repairs. (dem.grup, cast iron., decon.pipeline steel pipe in bud.) strobo.assembly (assembly of new.gzj.plate, assembly of now.pipeline, entry into, and insulation), as well as this will be done in the following way: promotion of proj., investor supervision and project cycle management. A proj.To be appointed will be governed by the law of the Public Prosecutor’s Office. The objectives of the proj are in line with the SZOOP ROP WiM, Axis 4, Energy Efficiency Priority ain.4c — as a result of the proposal through the comprehensive thermo-modernisation process, will result in a 54.75 % reduction in CO2 emissions in the building. (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0015/17
    0 references