Thermal modernisation of the boiler house and the laboratory of MPEC Sp. z o.o. in Braniewo (Q132239)

From EU Knowledge Graph
Revision as of 13:34, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the boiler house and the laboratory of MPEC Sp. z o.o. in Braniewo
Project in Poland financed by DG Regio

    Statements

    0 references
    570,176.42 zloty
    0 references
    136,842.34 Euro
    13 January 2020
    0 references
    704,791.62 zloty
    0 references
    169,149.99 Euro
    13 January 2020
    0 references
    80.9 percent
    0 references
    10 November 2016
    0 references
    8 February 2019
    0 references
    MIEJSKIE PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°22'45.1"N, 19°49'19.9"E
    0 references
    PRZEDMIOT PROJEKTU Projekt polega na głębokiej, kompleksowej termomodernizacji budynku kotłowni i laboratorium MPEC Braniewo zlokalizowanego w Braniewie przy ul. Stefczyka (działka nr 3/17, ob.12), pow.braniewski, woj. warm-maz, należącego do MPEC Sp. z o.o. w Braniewie ( użytkownika wieczystego działki, na której posadowiony jest ww budynek). Zakres prac termomodernizacyjnych jest zgodny z przeprowadzonym audytem energetycznym. ZAKRES RZECZOWY: 1. Prace przygotowawcze: oprac. audytu energ. ex ante, dok. przetargowej i projektowej - IV kw 2016- IV kw 2017 2. Roboty budowlane (docieplenie stropodachu kotłowni, docieplenie stropodachu laboratorium, docieplenie ścian kotłowni, docieplenie ścian laboratorium - parter, docieplenie ścian laboratorium - piętro, wymiana okien zewn., wymiana drzwi zewn) - I-III kw 2018 3. Nadzór inwestorski - I-III kw 2018r. 4. Opracowanie audytu energetycznego ex post - IV kw 2018 5. Promocja projektu - IV kw 2018. ETAPY REALIZACJI są tożsame z zakresem rzeczowym. SPOSÓB WDRAŻANIA Rezultaty Projektu zostaną w całości wdrożone przez Wnioskodawcę. Wszelkie elementy niezbędne do ich zrealizowania zostaną zakupione od dostawców/usługodawców wybranych zgodnie z zasadami konkurencyjności i/lub PZP. ZGODNOŚC Z ZAŁOŻENIAMI SZOOP RPO WiM 2014-2020 Projekt jest zgodny z założeniami określonymi w SZOOP dla Osi IV Efektywność energetyczna m.in. realizuje cele szczegółowe Osi: obniżenia zużycia en.pierwotnej w bud.publ, spadek emisji gazów ciepl. do atmosfery. Realizacja prac termomodernizacyjnych budynku przyczyni się do realizacji ww celów. Projekt jest zgodny z założeniami dla poddziałania 4.3.1 RPO Woj. warm.-maz.na lata 2014-2020: typ projektu - głęboka kompleksowa modernizacja budynków użyteczności publicznej, typ beneficjenta - przedsiębiorstwa, poziom dofinansowania zgodny z limitami dotyczącymi pomocy de minimis, spełnia wymogi określone w "limitach i ograniczeniach". (Polish)
    0 references
    The project consists of a deep, comprehensive thermal renovation of the boiler building and the MPEC Braniewo laboratory located in Braniewo at ul. Stefaczyk (plot No 3/17, OB.12), pow.abraewski, a maz-maz area belonging to the MPEC Sp. z o.o. in Braniewo (the perpetual usufructuary of the parcel on which it is located in the building). The scope of the renovation work is in line with the energy audit carried out. MATERIAL SCOPE: 1. Preparatory works: ex ante energy audit, tender and design document — IV kw 2016- IV kw 2017 2. Construction work (insulation of the boiler casing, thermal insulation of the laboratory, insulation of wall walls, insulation of the wall of the laboratory — ground floor, thermal insulation of the laboratory — floor, replacement of windows, replacement of the door) — I-III kw 2018 3. Investor supervision — I-III kw 2018 4. Audit of ex-post energy audit — IV k2018 5. Project promotion — IV kn 2018. The milestones are the same as the scope of material scope. The Project will be fully implemented by the Applicant. All necessary elements for their implementation will be purchased from suppliers/service providers selected in accordance with the principles of competitiveness and/or PHP. The project is in line with the objectives of the SZOOP ROP WM 2014-2020. the project is in line with the objectives set out in the SZOOP for Osi IV. the reduction of primary consumption in the construction of public buildings, the reduction of the gaseous emissions of the insulation of the atmosphere. The realisation of the renovation work of the building will contribute to the achievement of the objectives. The project is in line with the assumptions for sub-measure 4.3.1 ROP granm.maz.for the period 2014-2020: project type — deep comprehensive renovation of public buildings, type of beneficiary — enterprises, level of funding in line with the de minimis limits, fulfils the requirements of the “limits and limitations”. (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0009/17
    0 references