Comprehensive energy renovation of public buildings of the District of Lizbarbski District. (Q132313)

From EU Knowledge Graph
Revision as of 13:33, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 701,829.8663999999 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive energy renovation of public buildings of the District of Lizbarbski District.
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    2,924,291.11 zloty
    0 references
    3,823,052.52 zloty
    0 references
    917,532.6 Euro
    13 January 2020
    0 references
    76.49 percent
    0 references
    5 April 2016
    0 references
    31 January 2019
    0 references
    POWIAT LIDZBARSKI
    0 references

    54°7'50.2"N, 20°33'53.6"E
    0 references

    54°6'56.2"N, 20°7'49.1"E
    0 references
    Projekt dotyczy kompleksowej modern.energet.4 obiektów użyteczności publ.: Zespół Szkół i Placówek Oświatowych, Specjalny Ośrodek Szkolno-Wychowawczy i budynek administracyjny w Lidzbarku Warm. i Filia Starostwa Powiatowego w Ornecie. Zakres: prace przygot.(dok. projektowa z audytami energet.-K), roboty budowlane wynikające z audytów energet., oświetleniowych oraz dokumentacji (prace będące ulepszeniem termo-K-m.in.docieplenie ścian, stropów i dachów, wymiana drzwi zewn. i okien z parapetami, modernizacja instalacji co, instalacji elektr. z oświetleniem, wykonanie dodatkowej wentylacji mechan.,zmiana źródła ciepła-włączenie do sieci cieplnej, pozostałe prace remontowe towarzyszące termomodern. oraz prace nie będące ulepszeniem termo-NK,m.in.usprawn.dla niepełnospr.,kominy,orynnowanie,obróbki blach.,daszki,inst.odgrom.); nadzór w projekcie; promocja projektu; SW. Szczegół.opis zakresu każdego obiektu w pkt.2.2SW. Przedsięwzięcie zmniejszy straty wynikające z przenikania ciepła przez przegrody zewn., podwyższenie sprawności instalacji co i syst.wentylacji oraz zmniejszenie zużycia en.elektr. poprzez nowoczesne energooszczędne syst.oświetlenia. Przyczyni się do obniżenia kosztów utrzymania obiektów a uzyskane efekty ekolog.zmniejszą emisji gazów cieplarnianych i zmian klimatu. Przełoży się to na poprawę jakości powietrza atmosf.,warunków życia ludzi i stan dóbr kultury. Wpisuje się w cele i założenia SzOOP RPO WM2014-2020 w oś priorytet.4.Efektywność energetyczna, dział.4.3Kompleksowa modernizacja energetyczna budynków, poddz.4.3.1.Efektywność energetyczna w budynkach publicznych. Realizuje cel temat.4: Wspieranie przejścia na gospodarkę niskoemisyjną we wszystkich sektorach, priorytet inwest.4c: Wspieranie efektywności energetycznej, inteligentnego zarządzania energią i wykorzystania odnawialnych źródeł energii w infrastrukturze publicznej, w tym w budynkach publicznych i w sektorze mieszkaniowym, cel szczegółowy: zwiększona efektywność energet.bud.użyt.publicznej. (Polish)
    0 references
    The project is concerned with the comprehensive moderation of energy utilities of 4 public works: Assembly of Schools and Global Plucówek, Special School of Education and Training, and the Administrative Building of the District of the District of Warsaw and of the District of Filia Staroka District in Orney. Scope: meeting work. (design for energy audits), works resulting from energy audits, construction works resulting from energy audits., lighting and documentation (works improving thermoK-K-m.in.insulation of walls, ceilings and roofs, replacement of doors and windows with receipts, modernisation of the installation of the installation, electrical installation with lighting, performance of additional mechanical ventilation., change of the source ejection to the heat grid, other renovation works accompanying thermomodero, and works not being improved to thermo-NK, m.in.improved for disabled people, chimneys, markets, and sheet processing, dash, ind.odgrom.); supervision of the project; project promotion; SW. A detailed description of the scope of each facility in paragraph.2.2. of the SWE. The project will reduce the loss caused by the penetration of heat by the partitioning system, increase the efficiency of the installation as and for ventilation and reduce the consumption of the enorate by modern energy efficient lighting. It will help to reduce the costs of maintenance of sites and the environmental effects of green logging. they will reduce greenhouse gas emissions and climate change. This means improving air quality, living conditions and the condition of cultural goods. It is in line with the objectives and objectives of the ROP WM2014-2020 in the priority axis 4. energy efficiency, Chapter 4.3 — energy efficiency in buildings (4.3.1). energy efficiency in public buildings. Pursues the thematic objective of 4: Supporting the shift towards a low-carbon economy in all sectors, investment priority: 4c: Support for energy efficiency, smart energy management and use of renewable energy sources in public infrastructure, including in public buildings and in the housing sector, specific objective: increased energy efficiency in public use. (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0066/17
    0 references