Construction of the photovoltaic farm — bulkhead 2 (Q132059)

From EU Knowledge Graph
Revision as of 13:27, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the photovoltaic farm — bulkhead 2
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    2,061,301.1 zloty
    0 references
    494,712.26 Euro
    13 January 2020
    0 references
    2,576,626.38 zloty
    0 references
    618,390.33 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    11 April 2019
    0 references
    30 September 2019
    0 references
    KANCELARIA PRAWNA „CONSULTOR” DANIEL TOMASZ GRAMATOWSKI
    0 references
    0 references

    54°14'34.8"N, 22°2'38.8"E
    0 references
    Kancelaria Prawna „Consultor” Daniel Gramatowski planuje budowę instalacji fotowoltaicznej o mocy 600 kW wraz z niezbędną infrastrukturą techniczną, na terenie działki nr ewid. 50/3, położonej w obrębie geodezyjnym Grodzisko, gmina Banie Mazurskie, powiat gołdapski, województwo warmińsko-mazurskie. Ww. działka położona jest ona poza skupioną zabudową wsi Grodzisko, nie jest zabudowana. Powierzchnia działki nr 50/3 wynosi 2,7815 ha, a powierzchnia zabudowy planowanej inwestycji wynosi poniżej 1 ha. Produkowana przez elektrownię energia elektryczna, będzie dostarczana do sieci elektroenergetycznej, zgodnie z wydanymi warunkami przyłączenia przez PGE Dystrybucja S.A. Oddział Białystok poprzez przyłącze energetyczne do linii 15 kV Dąbrówka. Charakterystyczne parametry elektrowni fotowoltaicznej: • moduły fotowoltaiczne o mocy 310 W, • liczba modułów – 1 936 szt. • liczba inwerterów 10 szt. • stacja transformatorowa – 1 szt. Poszczególne rzędy paneli będą usytuowane na terenie działki na ustawionej tam typowej konstrukcji wsporczej. Posadowienie konstrukcji będzie następowało poprzez wbicie kafarem w grunt pionowych elementów podpór, a następnie wykonanie połączeń skręcanych z pozostałymi elementami konstrukcji. Konstrukcja wsporcza została zaprojektowana zgodnie z warunkami określonymi w decyzji o warunkach zabudowy. Projektowana farma fotowoltaiczna ma być obiektem budowlanym bezobsługowym. Projekt poprzez produkcję energii odnawialnej ze słońca i ograniczenie emisji zanieczyszczeń do powietrza, wpisuje się w Cel tematyczny 4 – Wspieranie przejścia na gospodarkę niskoemisyjną we wszystkich sektorach, Priorytet inwestycyjny 4a – Wspieranie wytwarzania i dystrybucji energii pochodzącej ze źródeł odnawialnych SzOOP RPO WiM Dz.4.1 Wspieranie wytwarzania i dystrybucji energii pochodzącej ze źródeł odnawialnych. (Polish)
    0 references
    The “Consultor” Legal Office, Daniel Gramacski, is planning to build a 600 kW photovoltaic power plant with the necessary technical infrastructure, on land parcel No eard. 50/3, located within the boundary of the geodesic to the bulkhead, the municipality of Buń Mazurskie, the powiat (powiat) of the town of Warmińsko-Mazurskie Province, Warmińsko-Mazurskie Province. This parcel is located outside of the agglomeration of the construction of a village, it is not built. The plot of land No 50/3 is 2.7815 ha and the surface of the planned investment is below 1 ha. The electricity produced by the power plant will be supplied to the electricity grid, in accordance with the conditions laid down in connection with the connection by PGE Distributor S.A. Branch Białystok via the energy connection to the 15 kV Dąbrówka line. Characteristic parameters of the photovoltaic power plant: • Power solar modules 310 W,• number of modules — 1 936 units • Number of 10 inverters • transformer station — 1 The various orders of the panels shall be located in a plot of a typical supporting structure on the land. Construction of the structure will take place through the penetration of the duck in the vertical legs of the legs and the subsequent construction of the joints with the other parts of the structure. The support structure is designed in accordance with the conditions laid down in the planning approval. The planned PV is intended to be an unserving construction. The project, by producing renewable energy from the sun and limiting emissions of pollutants into the air, is part of the 4 Thematic Objective — Supporting the shift towards a low-carbon economy in all sectors, investment priority 4a — Supporting the production and distribution of energy from renewable sources of the ROP WiM point.4.1 Supporting the generation and distribution of energy from renewable sources. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0477/17
    0 references