Improving energy efficiency using renewable energy sources plants facilities — district hospital in Pińczów (Q127657)

From EU Knowledge Graph
Revision as of 12:57, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving energy efficiency using renewable energy sources plants facilities — district hospital in Pińczów
Project in Poland financed by DG Regio

    Statements

    0 references
    4,144,598.31 zloty
    0 references
    994,703.59 Euro
    13 January 2020
    0 references
    4,875,998.01 zloty
    0 references
    1,170,239.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    31 December 2021
    0 references
    POWIAT PIŃCZOWSKI
    0 references
    Realizacja projektu obejmuje poprawę efektywności energet. 5-ciu budynkach użyteczn. publicznej, w których prowadzona jest działalność lecznicza w ramach Zespołu Opieki Zdrowotnej w Pińczowie. Interwencja wpisuje się w cel CT.4,oś3 ; priorytet inwestycyjny 4c RPOWŚ 2014-2020.Działania są zgodne z PGN gm. Pińczów oraz Gmin. Pr. Rewitalizacji Gm. Pińczów na lata 2015-2022. Projekt obejmuje modernizację: instalacji: c.o., c.w.u, ocieplenie stropodachów, ścian zewn., wymianę stolarki okiennej i drzwiowej, modernizację instalacji wentylacji, wymianę oświetlenia, zastosowanie systemu zarządzania energią. W wyniku realizacji szacowany spadek emisji gazów cieplarnianych obiektów o powierz. 9782,40 m2, wyniesie 341,57 tony równoważnika CO2/rok a zmniejszenie zużycia energii pierwotnej w/w budynkach wyniesie 1577921,67 kWh/rok łącznie. Zmniejszenie zużycia energii końcowej 3859,40 GJ/rok łącznie. Elementem projektu jest instalacja fotowoltaiczna obejmująca 140 paneli zamontowanych na budynkach objętych projektem. Średnioroczna ilość wyprodukowanej energii z ogniw fotowoltaicznych–36,12 MWhe. Działania te spowodują osiągnięcie efektu ekonom. w postaci oszczędności w zakresie kosztów energii elektr. i cieplnej w wartości 124393,37 rocznie. W wyniku realizacji oszczędność energii elektr. wyniesie - 173,70 MWh/rok, a cieplnej - 3104,10 GJ/rok. W ramach projektu zrealizowano prace przygotowawcze (audyt energetyczny, program funkcjonalno-użytkowy, studium wykonalności (I kwartał 2018). Elementem są też: świadczenie usług inspektora nadzoru nad pracami budowlanymi oraz obowiązkowe działania inform. i promocyjne i wykonanie audytu ex-post. Wnioskodawca posiada prawo dysponowania nieruchomością na cele budowlane. Uzyskanie pozwolenia na budowę będzie obowiązkiem Wykonawcy, wybranego w przetargu nieograniczonym-realizacja prac budowl. w formule "zaprojektuj i wybuduj".Projekt zakłada montaż wyłącznie nowych, nieużywanych elementów. Zakończenie projektu: 31.12.2021. (Polish)
    0 references
    The project involves improving energy efficiency. 5 public utility buildings in which a cure is carried out as part of the Health Care Team in Pińczów. The intervention shall be in line with the objective of the CT.4. at3; the investment priority 4c of the 2014-2020.Measures is in line with the PGG, Pińczów and the Municipalities. PR. Regeneration of Gm. Pińczów 2015-2022. The project includes modernisation: installations: C.O., c.w.w, warming up, internal walls, replacement of window and door frames, modernisation of ventilation facilities, replacement of lighting, application of the power management system. As a result of the implementation of the estimated decrease in greenhouse gas emissions of the objects of the carcass. 9 782.40 m² of equivalent CO2/rok is equivalent to 341,57 tonnes of equivalent and 1 577 921.67 kWh/year combined. Reduction in final energy consumption of 3859,40 GJ/year in total. The project element is a photovoltaic installation consisting of 140 panels installed on the buildings covered by the project. Annual average amount of solar PV energy produced — 36,12 MWth. These measures will achieve economic effects in the form of savings in the cost of electricity and heat at 124393,37 per year. As a result of achieving energy savings, the electricity will reach — 173.70 MWh/year and heat 3104,10 GJ/year. The project carried out preparatory work (energy audit, functional and utility program, feasibility study (Q2018)). The following elements are also included: the performance of the services of the inspector of the supervision of construction work and of the compulsory activity of publicity and the carrying out of an ex-post audit. The applicant shall have the right to have immovable property available for construction purposes. Obtaining a building permit will be the responsibility of the Contractor, selected in a tender not restricted by the completion of works. Project Completion: 31.12.2021. (English)
    0 references

    Identifiers

    RPSW.03.03.00-26-0051/17
    0 references