“Construction of a 1 MW solar PV farm” (Q127508)

From EU Knowledge Graph
Revision as of 12:42, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a 1 MW solar PV farm”
Project in Poland financed by DG Regio

    Statements

    0 references
    2,479,415.42 zloty
    0 references
    595,059.70 Euro
    13 January 2020
    0 references
    3,542,022.02 zloty
    0 references
    850,085.28 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 July 2018
    0 references
    30 September 2019
    0 references
    FOTOZE SPÓŁKA AKCYJNA
    0 references
    0 references
    Celem proj. jest ZWIĘKSZENIE UDZIAŁU ENERGII ELEKTRYCZNEJ PRODUKOWANEJ Z OZE W OGÓLNEJ PRODUKCJI ENERGII W WOJ. ŚWIĘTOKRZYSKIM. Długofalowymi korzyściami proj. będą spadeki emisji gazów cieplarnianych poprzez budowę FARMY FOTOWOLTAICZNEJ o mocy do 1MWe w m.Mokra,1,3km od obszarów NATURA2000. ZAKRES PROJ. OBEJMUJE: roboty budowlano-montażowe: budowę linii Sn, stacji trafo, rozdzielni w stacji trafo; montaż: paneli PV, konstrukcji pod moduł PV, inwerterów, uruchomienie farmy; montaż: gł. rozdzielni, instalacji uziemiającej i DC, oprzewodowania AC, system monitorująco-kontrolujący, oświetlenia, ogrodzenia, drogi, przyłącza kablowego SN; nadzór inwestorski, dz. prom. i inform. WSZYSTKIE ELEMENTY PROJ. BĘDĄ NOWE, PODPORZĄDKOWANE FUNKCJI JAKIEJ MAJĄ SŁUŻYĆ, TJ. PRODUKCJI ENERGII ELEKTRYCZNEJ Z OZE. W PROJ. BUDOWLANYM ZAPROJEKTOWANO ROZWIĄZANIA TECHNICZNE SPEŁNIAJĄCE WYMOGI BAT I NAJLEPSZYCH DOSTĘPNYCH TECHNIK. Okres realiz. :01.07.- 30.09.2019. Działania są zgodne z PGN dla G. Stąporków, Progr. ochrony powietrza WŚ, z Dyr.2012/27/UE, z zapisami Umowy Partn., RPOWŚ 2014-2020, SZOP. Instalacja spełnia standardy określone w Wytycznych kwalifikowania wydatków RPO. Projekt zgodny z celami szcz. osi prior. 3 – Efektywna i zielona energia i działaniem 3.1 Wytwarzanie i dystrybucja energii pochodzącej z OZE. Proj. jest zgodny z zas. horyzontalnymi UE, nie powoduje ingerencji w środowisko naturalne, zmianę klimatu, nie ma wpływu na ryzyko powodziowe. Wsk. produktu: L.przedsięb. otrzymujących wsparcie:1; L.wybudowanych jednostek wytwarzania energii elektrycznej z OZE:1. Wsk. rezultatu: Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE: 991,914 MWhe/r; Szacowany roczny spadek emisji gazów cieplarnianych: 803,45 tony równoważnika CO2/r; Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych: 0,998MWe; Wzrost zatrudnienia we wspieranych przedsiębiorstwach:1EPC; Wzrost zatrudnienia[…]-mężczyźni:1EPC (Polish)
    0 references
    The objective is to deal with the use of renewable energy produced from renewable energy sources. ŚWIĘTOKRZYSKIE. The long-term benefits of the project will be falling due to greenhouse gas emissions by the construction of a 1MWe MWe MWe M PV and 1.3 km from the NATURA2000. SCOPE PROJ. INCLUDES: construction and assembly work: construction of an Sn line, a hit station, a hit station; mounting: the PV panels, the design under the module PV, inverters, the launch of the farm; mounting: separation, in-situ and DC systems, AC guides, monitoring and control system, lighting, fencing, roads, SN cables; investor supervision, ferry services and inform. ALL ELEMENTS OF PROJ. THEY WILL BE NEW, SUBORDINATE TO THE FUNCTION TO BE USED, TJ. PRODUCTION OF ELECTRICITY FROM RENEWABLE ENERGY SOURCES. IN PROJ. CONSTRUCTION IS DESIGNED TO MEET BAT AND BEST AVAILABLE TECHNIQUES. The period of implementation. 01.07.- 30.09.2019. The operations are in line with the PGN for G. ądrach, the air protection programme for the WŚ, with Dir. 2012/27/EU, with the provisions of the partn., RZP of 2014-2020. The installation complies with the standards set out in the Guidelines on the eligibility of ROP expenditure. Project in line with the objectives of the priority axis. 3 — Efficient and green energy and action 3.1 generation and distribution of energy from RES. The proj is in line with the horizontal EU horizontal, does not cause interference with the environment, climate change, does not affect the risk of flooding. Product: LM in receipt of support: 1; 1 RES electricity generation units built. Result: Production of electricity from newly built/new generation capacity of RES installations: 991,914 MWhe/r; Estimated annual decrease in greenhouse gas emissions: 803,45 tonnes of equivalent CO2/r; Additional capacity for generating electricity from renewable sources: 0,998MWe; Employment growth in supported przedsiębiorstwach:1EPC; Employment growth [...] — mężczyźni:1EPC (English)
    0 references

    Identifiers

    RPSW.03.01.00-26-0060/17
    0 references