Construction of a transfer hub in the district of the railway station in Wiśło Centrum — stage II: Regeneration of the railway station building with its surrounding environment (Q126156)

From EU Knowledge Graph
Revision as of 12:31, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 426,391.1712 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a transfer hub in the district of the railway station in Wiśło Centrum — stage II: Regeneration of the railway station building with its surrounding environment
Project in Poland financed by DG Regio

    Statements

    0 references
    1,776,629.88 zloty
    0 references
    2,090,152.8 zloty
    0 references
    501,636.67 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 June 2016
    0 references
    31 December 2018
    0 references
    GMINA WISŁA
    0 references
    0 references
    Przedmiotem projektu jest rewitalizacja zabytkowego budynku dworca kolejowego. Remont obejmie lewą stronę parteru budynku, kotłownię, windę oraz prawą stronę I piętra. Po przebudowie pierwotna bryła budynku zostanie zachowana. Parter będzie przedmiotem dzierżawy i zostanie odrestaurowany do stanu surowego. Dalsze prace wraz z wyposażeniem wykona przyszły dzierżawca. Na pierwszym piętrze powstanie przestrzeń dla seniorów i innych grup zagrożonych wykluczeniem społecznym. Organizacje pozarządowe, z którymi Gmina Wisła podejmie współpracę, organizować będą warsztaty i szkolenia umożliwiające integrację, podnoszenie kwalifikacji oraz udział w życiu kulturalnym i społecznym miasta dla w/w grup społecznych. Zaprojektowano wymianę stropów, więźby dachowej, stolarki okiennej i drzwiowej, instalacji elektrycznych i sanitarnych, schodów wewnętrznych i zewnętrznych oraz wzmocnienie i naprawę ścian konstrukcyjnych zewnętrznych i wewnętrznych. (Polish)
    0 references
    The object of the project is the regeneration of the historic building station. The renovation will include the left side of the ground floor of the building, the boiler, the elevator and the right of the first floor. After the conversion, the original building of the building will be maintained. The ground floor will be leased and restored to the crude state. Further work with the equipment will be carried out by the future tenant. The first floor will create a space for older people and other groups at risk of social exclusion. The NGOs with which the Municipality of Vistula will work together will organise workshops and training for integration, upgrading of skills and participation in the cultural and social life of the city for the social groups. The sides are designed to replace the piles, roof prisoners, window and door frames, electrical and sanitary installations, internal and external stairs and the reinforcement and repair of external and internal structures. (English)
    0 references

    Identifiers

    RPSL.10.03.05-24-07E5/17
    0 references