Modernisation of boiler housing in the way of optimising the power of biomass boilers. (Q122501)

From EU Knowledge Graph
Revision as of 11:32, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 252,192.5328 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of boiler housing in the way of optimising the power of biomass boilers.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,050,802.22 zloty
    0 references
    2,058,365.85 zloty
    0 references
    494,007.8 Euro
    13 January 2020
    0 references
    51.05 percent
    0 references
    8 November 2016
    0 references
    30 November 2018
    0 references
    GMINA PRZECHLEWO - ZAKŁAD GOSPODARKI KOMUNALNEJ
    0 references
    0 references
    Przedmiotem inwestycji jest przebudowa z rozbudową kotłowni osiedlowej w Przechlewie opalanej biomasą oraz przebudowa odcinków sieci kanalizacji sanitarnej i deszczowej oraz budowa instalacji fotowoltaicznej. Zakres inwestycji obejmuje realizowane kolejno: -przebudowę odcinków sieci kanalizacji sanitarnej i deszczowej, -rozbudowę budynku kotłowni, -demontaż wyeksploatowanego kotła o mocy 2,5MW i montaż dwóch nowych kotłów o łącznej mocy 1,6MW. - montaż paneli fotowoltaicznych o mocy 20kWp. W wyniku realizacji zadania szacowany roczny spadek emisji gazów cieplarnianych spowodowany znacznie mniejszym zużyciem prądu wyniesie- redukcja bezwzględna - 47,95 Mg CO2 (46,08%) a uwzględniając dodatkową produkcję prądu z instalacji fotowoltaicznej wskaźnik rezultatu będzie następujący: redukcja bezwzględna – 62,38 Mg CO2 (59,94%) Ponadto nastąpi redukcja: pyłów ogólnych - 1,166 Mg/rok SO2 - 0,506 Mg/rok NOx - 0,622 Mg/rok CO - 0,622 Mg/rok Emisja równoważna - 6,002 Mg/rok. (Polish)
    0 references
    The subject of the investment project is the reconstruction of the construction of residential heating plants in the field of sunfired biomass and the reconstruction of sections of the sanitary and storm-water sewerage system and the construction of a photovoltaic installation. The scope of the investment consists of the following: The reconstruction of sections of the sanitary and storm-water sewerage system, the extension of the boiler building, the dismantling of the 2.5 MW boiler run and the installation of two new boilers with a total capacity of 1.6 MW. Installation of 20kWp photovoltaic panels. As a result of the implementation, the estimated annual decrease in greenhouse gas emissions due to a significantly lower amount of electricity consumption will be caused — by the absolute reduction — 47,95 Mg CO2 (46.08 %) and given the additional generation of electricity from the photovoltaic installation, the result will be the following: absolute reduction — 62,38 Mg CO2 (59.94 %). general particulates — 1,166 Mg/year SO2-0,506 Mg/year CO — 0,622 Mg/year CO — 0,622 tonnes/year Emission equivalent — 6,002 tonnes/year. (English)
    0 references