Smille from smiling (Q120114)

From EU Knowledge Graph
Revision as of 11:17, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Smille from smiling
Project in Poland financed by DG Regio

    Statements

    0 references
    156,036.62 zloty
    0 references
    37,448.79 Euro
    13 January 2020
    0 references
    183,572.5 zloty
    0 references
    44,057.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 July 2018
    0 references
    31 August 2019
    0 references
    STOWARZYSZENIE DLA EDUKACJI
    0 references
    0 references
    0 references
    Proj zrodził się z potrz zapewn dodatk m-sc wych przedszk dla dz w wieku 3-6 lat na terenie GK. Celem gł proj jest zwiększ dostępn do eduk przedszk dla 20 dz (13 ch) w tym 2 dz niepełn. w wieku 3-6 lat z terenu GK w okresie 02.07.2018 do 31.08.2019 poprzez utw 20 nowych miejsc wych przedszk. Proj ma na celu likwid gł czynnika utrudn dostęp do eduk przedsz jakim jest zbyt mała licz oddz i miejsc w OWP. Gr doc w proj stanowi 20 dz (13 ch) w wieku 3-6 lat o utrudn dost do wczesnej eduk zam na obszarze GK, nowo utw miejsc w OWP, kadra pedag zatrudn w OWP, rodz i opiek prawni dz w wieku przedszk. Zakł rezultaty proj to: -utworzenie 20 nowych miejsc wych przedszk na ter GK -objęcie 20 dz (13 ch) w tym 2 dz niep (2ch) w wieku 3-6 lat wychowaniem przedszkolnym w ramach podstawy programowe -objęcie 20 dz (13 ch) w tym 2 dz niep (2ch) w ramach proj dodatk zajęciami zwiększającymi ich szanse edukacyjne w edukacji przedszk. -zapewnienie warunków do wszechstronnego rozwoju dz Cel proj zam zrealiz poprzez przeprow nast. działań: a) zakup i montaż wypos w tym mebli, wypos wypocz, sprzętu TIK, oprogram, zakup zab pom dydakt, specjalist sprz lub narzędzi dostosow do rozpozn potrzrozw i edukac, wspomag rozwoju i prowadz terapii dz ze specjaln potrz eduk w postaci prowadz zaj ze specjalistami; b) realiz podst progr wychow przedszk dla 20 dz (13 ch) w tym 2 dz niep w nowo utworz oddz przedszk w SPR w tym koszty wynagr nauczy, koszty żyw c) organizację i realizację zaj dodat dla 20 dz (13 ch) w tym 2 dz niep w okr 1.IX 2018 do 31VIII 2019 w nowo utworz oddziale przedszk w SPR w tym koszty wynagr nauczycieli d) zmniejszenie nierówn w stopniu upowsz eduk przedszk. Proj realiz jest w gm o poz upowszech wych przedszk poniżej śr dla woj podkarpackiego. Stowarzyszenie Dla Edukacji w Reczpolu jako organ prowadzący SPR wraz z oddz przedszk nie korzystało ze środków EFS dostępnych w latach 2007-2013 w ramach Poddziałania 9.1.1. (Polish)
    0 references
    The proj was born out of the GK in the GK for 3-6 years old. The aim is to get an increase in the pre-school education system for 20 dz (13 h) of which 2 dz of the incomplete 20-year-olds aged 3-6 from the GK site in the period from 02.07.2018 to 31.08.2019. Proj has the purpose of dealing with a factor which is difficult to access to the front line of a small number of places and places in the PLO. The doc in proj represents 20 dz (13 ch) of 3-6 year olds with handicaps for early childhood education in the GK, a newly uttering position in the PLO, a person who recruits in the PLO, a person who has passed the PLO. The results of the Proj are: — the creation of 20 new main points per ter GK — 20 dz (13 ch) including 2 dz no (2ch) of 3-6 years of pre-school education within the programme base — 20 dz (13 ch) including 2 dz no (2ch), including dz no (ch), as part of a positive response to their educational opportunities in the field of pre-k education. Ensuring the conditions for comprehensive development (a) the purchase and assembly of equipment, including furniture, equipment, ICT equipment, software, the purchase of the diffusion rates, specialised equipment or tools for adjusting to the field and to the education, development assistance and guidance for the treatment of special secondary courses in the form of contact with specialists; (b) the implementation of the PRGR section for 20 dz (13 ch) of which 2 dz up to W np in the newly created SPR including tuition fees, mission costs c) the organisation and implementation of an addition for 20 dz (13 ch) including 2 dz up.no in okr 1.IX 2018 to 31VIII 2019 in the newly created Prek branch in SPR including the cost of teachers (d) a reduction in the overhead teacher (d). Please respond to the position of the gam with the position of the bill for Podkarpackie. The Association for Education in Rezpol, as the lead authority of the CLS, did not benefit from the ESF resources available in the period 2007-2013 under Measure 9.1.1. (English)
    0 references

    Identifiers

    RPPK.09.01.00-18-0008/17
    0 references