Reduce social, economic and spatial problems in the municipality of Lubaczow through the regeneration of brownfields and post-industrial facilities and its surroundings (Q119194)

From EU Knowledge Graph
Revision as of 11:03, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 2,156,846.9808 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reduce social, economic and spatial problems in the municipality of Lubaczow through the regeneration of brownfields and post-industrial facilities and its surroundings
Project in Poland financed by DG Regio

    Statements

    0 references
    8,986,862.42 zloty
    0 references
    11,982,483.33 zloty
    0 references
    2,875,796.0 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    1 October 2019
    0 references
    28 February 2022
    0 references
    GMINA LUBACZÓW
    0 references
    Celem głównym projektu jest stworzenie warunków do wzrostu przedsiębiorczości oraz integracji i aktywizacji mieszkańców, poprzez odnowę zdegradowanych obiektów i przestrzeni, prowadzącą do rozwiązania zdiagnozowanych problemów społecznych. Projekt dotyczy następujących zadań inwestycyjnych: 1) Rozbudowa i przebudowa budynku stacji Basznia – Galeria Kolejnictwa - poprzez rozbudowę i przebudowę budynku stacji oraz obiektów gospodarczych znajdujących się w jej otoczeniu na Galerię Kolejnictwa (Zadanie 1) oraz kompleksowe odrestaurowanie lokomotywy i wagonów (Zadanie 2) i konserwację obiektów mostowych (Zadanie 3) które będą stanowić eksponaty; 2) Nadanie nowych funkcji obiektom pokolejowym wraz z zagospodarowaniem otoczenia funkcjonalnie związanego z budynkiem – wodnej wieży ciśnień w Tymcach i stacji Basznia Dolna - poprzez przebudowę stacji do pełnienia funkcji zaplecza socjalno-sanitarnego obserwatorium wraz z przebudową drogi dojazdowej (Zadanie 4 i 7) oraz poprzez przebudowę wieży ciśnień i budynku hydroforni na obserwatorium wraz z przebudową drogi wewnętrznej pomiędzy obserwatorium a zapleczem (Zadanie 5 i 7);3) Przebudowa i nadbudowa byłej Zlewni Mleka – poprzez przebudowę, nadbudowę i zmianę sposobu użytkowania z przeznaczeniem na budynek do prowadzenia działalności gospodarczej wraz z zagospodarowaniem przyległego otoczenia. 4) Rozbudowa i przebudowa zabytkowej plebanii na Izbę Pamięci - poprzez przebudowę budynku, w celu nadania nowych funkcji społecznych z przeznaczeniem na utworzenie lokalnej izby pamięci poświęconej historii Baszni Dolnej i okolic. Przebudowa i rozbudowa obiektów pokolejowych, popegeerowskich i poprzemysłowych przyczyni się do tworzenia estetycznej i funkcjonalnej przestrzeni oraz wzrostu estetyki obszaru rewitalizacji. Nadanie nowych funkcji obiektom z przeznaczeniem na cele społeczne, kulturalne, edukacyjne, turystyczne i gospodarcze wpłynie na niwelowanie zdiagnozowanych problemów, przede wszystkim społecznych. (Polish)
    0 references
    The main objective of the project is to create the conditions for the growth of entrepreneurship and for the integration and activation of inhabitants, through the restoration of degraded facilities and space, leading to the resolution of identified social problems. The project concerns the following investment tasks: (1) Building and reconstruction of the Basonia station — Galeria Order Building — through the extension and reconstruction of the station building and of the economic facilities in its surroundings to the Railway Gallery (Task 1) and the restoration of the locomotive and wagons in its full restoration (Activity 2) and the maintenance of bridges (Task 3), which will be objects; (2) New functions for railway installations and the management of the environment functionally linked to the building — the water tower in the main and the station of Basnia Dolna — by upgrading the station to perform the functions of the social and health facilities of the observatory together with the reconstruction of the access road (Zadanie 4 and 7) and by converting the water tower and the hydroelectric room in the observatory to the observatory together with the reconstruction of the inner road between the observatory and the centre (Task 5 and 7); (3) Construction and overconstruction of the former milk catchment area by means of reconstruction, overbuilding and change of use for the building for economic activities, including the development of an adjacent environment. 4) Extension and reconstruction of the heritage back to the chamber of remembrance, by reconstructing the building in order to impart new social functions for the creation of a local memorial service dedicated to the history of the Basni Lower House and the surrounding area. Reconstruction and extension of railway facilities, popegerans and postgrades will contribute to the creation of an aesthetic and functional space and a growth in the aesthetics of the regeneration area. Giving new features to sites for social, cultural, educational, touristic and economic objectives will impact the problem of diagnosed problems, in particular social ones. (English)
    0 references

    Identifiers

    RPPK.06.03.00-18-0024/18
    0 references