Extension and reconstruction with modernisation of the wastewater treatment plant in Stwiki (Q117138)

From EU Knowledge Graph
Revision as of 10:58, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 1,483,884.4919999999 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension and reconstruction with modernisation of the wastewater treatment plant in Stwiki
Project in Poland financed by DG Regio

    Statements

    0 references
    6,182,852.05 zloty
    0 references
    9,698,591.46 zloty
    0 references
    2,327,661.95 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    15 October 2019
    0 references
    30 September 2022
    0 references
    GMINA STAWISKI
    0 references

    53°22'47.3"N, 22°9'17.6"E
    0 references
    Oczyszczalnia ścieków zlokalizowana jest na obrzeżach Miasta Stawiski, w pobliżu rzeki, na działce o nr geod. 567/2, przylegającej do rowu melioracyjnego R-C, mającego ujście do rzeki Dzierzba w km 10+510. Bezpośrednim odbiornikiem ścieków oczyszczonych jest rów melioracyjny R-C, który ma ujście do rzeki Dzierzby w odległości ok 95 m od miejsca zrzutu ścieków z oczyszczalni. Oczyszczalnia obsługuje głównie miasto, Ilość dowożonych ścieków z terenu gminy jest niewielka i nie przekracza ok. 8 m3/d. Odbiornikiem ścieków oczyszczonych jest rów melioracyjny R-C mający ujście do rz.Dzerzbia w km.10+510. Na podstawie dotychczasowych doświadczeń eksploatacyjnych oraz obecnego poziomu wiedzy w zakresie technologii oczyszczalni ścieków i wymagań dla ścieków oczyszczonych zakłada się następujący główny kierunek rozbudowy i modernizacji oczyszczalni ścieków oraz jej poszczególnych obiektów: a) dostosowanie podstawowego procesu technologicznego w zakresie biologicznego oczyszczania ścieków do parametrów umożliwiających oczyszczanie docelowych ładunków zanieczyszczeń w wymaganym stopniu poprzez budowę nowego multireaktora biologicznego b) modernizację istniejącego budynku odwadniania osadów z zachowaniem funkcji c) modernizacja istniejących komór: defosfatacji i napowietrzania I-go stopnia d) budowa nowego budynku technologicznego wraz z węzłem mechanicznego podczyszczania i stacją dmuchaw e) budowę pompowni głównej f) budowę wiaty garażowo-magazynowej g) budowę budynku administracyjno-biurowego wraz z dyspozytornią h) przebudowę i modernizację instalacji elektrycznych oraz AKPiA i) modernizacje lagun osadowych j) modernizacja poletka osadowego j) budowa zintegrowanego systemu automatyki dla zarządzania Oczyszczalnią ścieków , stacją uzdatniania wody i pompowniami na sieci kanalizacyjnej . l) budowa stacji zlewczej ścieków dowożonych (Polish)
    0 references
    The waste water treatment plant is located on the periphery of Staviski, close to the river, on a plot of ageation. 567/2, which is adjacent to the drainage ditch R-C, which goes into a river splitting at km 10 + 510. The direct receiver of the treated waste water is the drainage ditch R-C, which has a drainage ditch into the river between approximately 95 m from the point of the discharge of the waste water from the treatment plant. The plant mainly operates the city, the amount of waste water from the municipality is low and does not exceed approx. 8 m³/d. the receiver of the treated waste water is the drainage ditch R-C in order to escape the Drzebia in km.10 + 510. On the basis of the existing operational experience and the current level of knowledge on the technology of the waste water treatment plant and the requirements for purified waste water, the following main directions for the extension and modernisation of the wastewater treatment plant and its individual plants are assumed: (a) adjusting the primary process for the biological treatment of waste water to the parameters for the clean-up of the polluting loads in the required degree by the construction of a new multireactor (b) modernisation of the existing building’s sludge from the maintenance of functions (c) the upgrade of the existing chambers: defosfatation and aeration I of step (d) construction of a new technological building with a mechanical junction of cleaning and dmuchade station (e) construction of the construction pumping station (f) construction of a built office building with a facility (h) reconstruction and modernisation of electrical installations and AKPiA (i) upgrading of sludge ponds (j) modernisation of the tailings dam (j) construction of an integrated automation system for the management of the waste water treatment plant, water treatment station and sewage pumping stations. (l) construction of a water catchment area of feeder waste water. (English)
    0 references

    Identifiers

    RPPD.06.02.00-20-0036/19
    0 references