Limiting the introduction of cleanliness to the environment by construction of the sanitary sewage system (III stage) with the reconstruction of the water supply network and modernisation of the water intake of ‘Grabowiec’ in Mielec (Q117133)

From EU Knowledge Graph
Revision as of 10:58, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 405,572.39759999997 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Limiting the introduction of cleanliness to the environment by construction of the sanitary sewage system (III stage) with the reconstruction of the water supply network and modernisation of the water intake of ‘Grabowiec’ in Mielec
Project in Poland financed by DG Regio

    Statements

    0 references
    1,689,884.99 zloty
    0 references
    1,988,100.0 zloty
    0 references
    477,144.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 August 2017
    0 references
    31 August 2018
    0 references
    GMINA MIELNIK
    0 references
    0 references

    52°19'51.2"N, 23°2'56.0"E
    0 references
    W ramach inwestycji planuje się: 1) Budowę kanalizacji w Mielniku - III etap - 921,00 m kanału, 34 odgałęzienia, 1 przepompownia indywidualna; 2) Przebudowę sieci wodociągowej w Mielniku (o długości łącznej 0,85 km) w ulicach: a. Biała (o długości 0,53 km); b. Duboisa (o długości 0,32 km); 3) Modernizację ujęcia wody „Grabowiec” w Mielniku: a. Przebudowa węzłów wodnych w studniach głębinowych SW1 na działce nr 6852 i SW2 na działce nr 6853 w Mielniku oraz odcinków tłocznych do trójnika połączeniowego; b. Modernizacja 4 węzłów wodnych w Mielniku; c. Zakup agregatu prądotwórczego; Dodatkowo przewidziano w projekcie wydatki na nadzór inwestorski oraz sporządzenie studium wykonalności. Realizacja projektu pozwoli na osiągnięcie następujących wskaźników: a) na poziomie produktu: - Długość wybudowanej kanalizacji sanitarnej - 0,92 km; - Długość przebudowanej sieci wodociągowej – 0,85 km; b) na poziomie rezultatu: – Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków – 117 RLM; – Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę - 98 osób; – Wydajność dobowa zmodernizowanych ujęć wody - 340 m3/dobę; – Wzrost zatrudnienia we wspieranych podmiotach (innych niż przedsiębiorstwa) – 0 EPC; Łączny koszt inwestycji wyniesie 2 445363,00 zł (brutto), z czego wydatki kwalifikowane będą stanowić 1 988 100,00 zł, podatek VAT nie jest kosztem kwalifikowanym. Dotacja w wysokości 85% kosztów kwalifikowalnych będzie stanowić 1 689 884,99 zł. Pozostała kwota kosztów kwalifikowalnych w wysokości 298215,01 zł oraz całość kosztów niekwalifikowalnych stanowi wkład własny Gminy Mielnik. Termin realizacji projektu przewidziano od lipca 2017 do sierpnia 2018. (Polish)
    0 references
    As part of the investment, it is planned to: 1) Construction of a sewerage system in Mielec — III step — 921.00 m of the channel, 34 branches, 1 individual pumping station; 2) Construction of water supply network in Mielec (of a total length of 0.85 km) in the streets: A. Biała (of a length of 0.53 km); Mr DUBOSA (of a length of 0.32 km); 3) Modernisation of the water intake of ‘Grabowiec’ in Mielec: a. construction of water nodes on deep-sea wells of SW1 on plot No 6852 and SW2 on plot No 6853 in the Mielnik and sections of the piston in the connection triangle; b. upgrading the 4 nodes in the Mielnik; the purchase of a power generator; In addition, expenditure on investor supervision is included in the project and a feasibility study is drawn up. The implementation of the project will enable the following indicators to be achieved: at product level: — Length of the built sewage system — 0.92 km; — Length of the water mains network reconstructed 0.85 km; at result level: — Number of additional persons benefiting from an improved waste water treatment — 117 p.e.; — Number of additional persons served by improved water supply — 98 persons; — The daily performance of improved water supply facilities — 340 m³/day; Employment growth in supported entities (other than enterprises) — 0 FTE; The total cost of the investment will be PLN 2 445363,00 (gross), of which eligible expenditure will amount to PLN 1 988 100,00, VAT is not eligible. The grant amounting to 85 % of the eligible costs will amount to PLN 1 689 884,99. The remaining amount of eligible costs of PLN 298215,01 and all ineligible costs are the own contribution from the municipality of Mielnik. The project is scheduled to run from July 2017 to August 2018. (English)
    0 references

    Identifiers

    RPPD.06.02.00-20-0022/17
    0 references