Increasing availability to highly specialised medical services in Malopolska by completing construction works and equipping the Specialist Diseases Hospital Płuc ‘Reborn’ in Zakopane (Q114514)

From EU Knowledge Graph
Revision as of 09:50, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 2,770,893.9455999997 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increasing availability to highly specialised medical services in Malopolska by completing construction works and equipping the Specialist Diseases Hospital Płuc ‘Reborn’ in Zakopane
Project in Poland financed by DG Regio

    Statements

    0 references
    11,545,391.44 zloty
    0 references
    17,014,485.07 zloty
    0 references
    4,083,476.42 Euro
    13 January 2020
    0 references
    67.86 percent
    0 references
    15 February 2018
    0 references
    31 December 2019
    0 references
    SZPITAL SPECJALISTYCZNY CHORÓB PŁUC „ODRODZENIE” IM. KLARY JELSKIEJ
    0 references
    0 references
    Przedmiotem projektu jest dobudowa, rozbudowa, przebudowa istniejącego budynku szpitalnego wraz z przebudową i rozbudową istniejącego budynku tlenowni oraz urządzeń towarzyszących takich jak: dojścia i dojazdy, droga pożarowa i miejsca postojowe o nawierzchni utwardzonej i mur oporowy. Ponadto, przewiduje się przebudowę sieci energetycznej i przyłączy energetycznych, kanalizacji sanitarnej i burzowej oraz wykonanie przyłączy gazów medycznych oraz zew. sieci oświetleniowej.Dane wskaźnikowe projektowanego budynku:a Projektowana ilość kondygnacji: 7b Pow. zabudowy: istniejąca: 650,00 m2, istniejąca podlegająca rozbudowie: 350,00 m2, projektowana: 1 194,80 m2c Pow. użytkowa: istniejąca: 3 183,52 m2, istniejąca podlegająca przebudowie: 849,14 m2, projektowana: 1 803,84 m2d Pow. całkowita: istniejąca: 5 386,45 m2, projektowana: 2 078,41 m2e Kubatura: istniejąca: 20 623,70 m3, projektowana: 8 117,20 m3Przebudowa zakłada głównie wydzielenie istniejących klatek schodowych wraz ze zmianą przeznaczenia kilku pomieszczeń i wymianą wewnętrznej stolarki drzwiowej w celu dostosowania do wymogów bezpieczeństwa przeciwpożarowego i właściwego funkcjonowania tego typu obiektów. W ramach rozbudowy dokona się wyburzenia ostatniej kondygnacji na północnej części istniejącego budynku tj. pierwszego piętra i wybudowanie dodatkowych czterech pięter. Dobudowę będzie stanowić nowy dźwig służący do przewożenia pacjentów na wózkach, dodatkowa klatka schodowa stanowiąca ewakuację, a także dodatkowe skrzydło budynku od północno zachodniej strony. Ponadto, w ramach przedsięwzięcia planuję się zakup 9 łóżek wielofunkcyjnych na potrzeby sali wybudzeniowej oddziału OIOM.Liczba wspartych podmiotów leczniczych 2019 rok: 1 szt.Nakłady inwestycyjne na zakup aparatury medycznej 2019 rok: 1 407 510,00 zł.Ludność objęta ulepszonymi usługami zdrowotnymi 2020 rok: 342 576 os.Liczba osób leczonych w podmiotach leczniczych objętych wsparciem 2020 rok: 4 094 os.rok (Polish)
    0 references
    The object of the project is the completion, extension, modification of an existing hospital building with the construction and extension of the existing oxygen building, and associated facilities, such as: walking and driving, fire road and parking spaces with paved and retaining pavements. In addition, it provides for the reconstruction of the energy network and energy connections, the sanitary and storm water system and the construction of connections for medical gases and on the heating network. the indicative figure of the building: and the draft amount of floor: 7b Sealing: existing: 650.00 m², existing under extension: 350.00 m², designed: 1 194,80 m2c for use: existing: 3 183.52 m², existing subject to the conversion: 849.14 m², designed: 1 803,84 M2D Total: existing: 5 386.45 m², designed: 2 078,41 m2s cups: existing: 20 623.70 m³, designed for: 8 117,20 m3Reconstruction consists mainly of the separation of existing stairwells with the modification of the intended use of several rooms and the replacement of the internal doors of the door for the purpose of adapting to fire safety requirements and the proper functioning of such facilities. The extension will demolish the final storey in the northern part of the existing building, i.e. the first floor and the building of an additional four floors. The construction of the building will be a new crane for the carriage of patients on a wheelchair, an additional staircase to be evacuated, as well as an additional wing of the building from the north west of the site. In addition, as part of the project I plan to purchase 9 multifunctional beds for the facility of the OOPOM.Number of medical entities supported 2019: 1 Investments for the purchase of medical equipment for 2019: PLN 1 407 510,00 for improved health services 2020: 342 576 Number of persons treated with therapeutic entities supported by 2020: 4 094 year.year (English)
    0 references

    Identifiers

    RPMP.12.01.03-12-0613/17
    0 references