Programme to extend the use of renewable energy sources and to improve the quality of the environment within the NATURA 2000, Suskiy District — AZBEST (Q112592)

From EU Knowledge Graph
Revision as of 09:26, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Programme to extend the use of renewable energy sources and to improve the quality of the environment within the NATURA 2000, Suskiy District — AZBEST
Project in Poland financed by DG Regio

    Statements

    0 references
    811,074.48 zloty
    0 references
    194,657.88 Euro
    13 January 2020
    0 references
    954,205.29 zloty
    0 references
    229,009.27 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2018
    0 references
    31 December 2020
    0 references
    POWIAT SUSKI
    0 references
    0 references
    Przedmiotem projektu jest :a przekazanie w okresie 2018 2021 do unieszkodliwienia około 2000 Mg wyrobów zawierających azbest z około 798 obiektów 2018 266 obiektów , 2019 266 obiektów , 2020 266 obiektów znajdujących się na terenie Powiatu Suskiego. Stworzone będą dwa warianty dofinansowania dostępne dla beneficjenta końcowego obejmującego następujące koszty :Wariant A unieszkodliwianie i transport odpadów zawierających azbest bez demontażu Wariant B unieszkodliwianie i transport odpadów zawierających azbest wraz z demontażem Przyjęte rozwiązania są zgodne z najlepszymi praktykami w tym zakresie, gdyż w prowadzonym postępowaniu jako warunki dopuszczające ustala się konieczność posiadania ważnego zezwoleniea w zakresie gospodarowania materiałami niebezpiecznych zawierających azbest wydane w oparciu o ustawę z dnia 14 grudnia 2012 r. o odpadach tj. Dz. U. z 2013 r. poz. 21 z późn. zm. oraz konieczność wykazania zrealizowania min 2 robót związanych z zagospodarowaniem odpadów zawierających azbest o wartości min 50 000 zł.Zorganizowany będzie system obsługi i kontroli projektu. Ceny za usługę transportu, unieszkodliwiana, demontażu wyrobów zawierających azbest przyjęto w oparciu o analizę kosztów wykonanych w ramach prowadzonego postępowania przetargowego w 2017 r., w tym zakresie. Przyjęte rozwiązania odpowiadają na zdiagnozowane potrzeby ujęte w części C 1 niniejszego wniosku. (Polish)
    0 references
    The project consists of: a transfer in the period 2018 2021 to disposal of approximately 2000 Mg of articles containing asbestos from approximately 798 sites, 2019 266 sites, 2020 266 sites in the District of Suez. Two options will be created for the financing of the final beneficiary covering the following costs: option A — disposal and transport of waste containing asbestos without the dismantling of Wariant B and transport of waste containing asbestos and the dismantling adopted. these are in line with best practice in this respect, as in the proceedings being conducted as authorising conditions it is necessary to hold a valid permit for the management of hazardous materials containing asbestos issued on the basis of the Waste Act of 14 December 2012: Dz. (Polish Journal of Laws of 2013, item 21 as amended and the need to prove the implementation of the 2 waste management works containing asbestos of min. 50 000, a system for the operation and control of the project will be organised. The price of the transport service, which is disposed of, the removal of asbestos-containing products was adopted on the basis of an analysis of the costs incurred in the course of the tender procedure in 2017, in this respect. The solutions adopted correspond to the identified needs in Part C 1 of this proposal. (English)
    0 references

    Identifiers

    RPMP.05.02.02-12-0482/17
    0 references