Protection against devastation, renovation and installation of the castle in the jails with a mini-brewery and a museum exhibition on the history of the Prince and its inhabitants. (Q112764)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Protection against devastation, renovation and installation of the castle in the jails with a mini-brewery and a museum exhibition on the history of the Prince and its inhabitants. |
Project in Poland financed by DG Regio |
Statements
7,567,991.27 zloty
0 references
13,759,984.15 zloty
0 references
55.0 percent
0 references
1 October 2017
0 references
31 December 2019
0 references
FUNDACJA ZAMEK W ZATORZE
0 references
Przedmiotem niniejszego projektu będzie rewitalizacja zabytkowego Zespołu zamkowo parkowego dalej: ZZP położonego w centrum Zatora, przy placu Kościuszki 1, wpisanego do rejestru zabytków woj. mało. pod numerami: 371 z 17 maja 1947 r., A397 z 2 grudnia 1972 r. i A30078 z 20 kwietnia 1978. Zakłada się przeprowadzenia szeregu prac budowlanych i renowacyjnych, oraz zakup niezbędnego wyposażenia wyposażenie nie będzie tutaj dotyczyło odtwarzania zabytkowych eksponatów itp., ale będzie służyło rozwinięciu w Zamku funkcji komercyjnych. Realizację projektu zaplanowano na okres od 01.2017 r. do 12.2019 r.Najważniejszą częścią projektu będą prace budowlane, wymagające pozwolenia na budowę. Generalnie można je podzielić na cztery grupy: pierwszą stanowią roboty budowlane z podziałem na prace związane z piwnicą, parterem, piętrem I, II, i poddaszem, oraz dachem i elewacją. Druga grupa dotyczy robót typowo instalacyjnych, z podziałem na wentylację mechaniczną, instalacje CO, wod kan, instalację gazową, elektryczną i niskoprądową. Dwa pozostałe grupy mają znacznie mniejszy charakter, jednakże nie wpisują się one w 2 powyższe kategorię. Dotyczy to montaży wind w obiekcie osobowej, dwóch kuchennych i jednego podnośnika dla osób niepełnosprawnych, oraz wykonanie drogi pożarowej. W celu zapewnienia obiektowi funkcji komercyjnych i użytkowych przewidziano zakup niezbędnego wyposażenia, którego główny koszt stanowi wyposażenie mini browaru z warzelnią o objętości 55 HLWAR. Jego zakup jest ważną częścią popularyzacji Zamku w Zatorze, ale równocześnie jest nawiązaniem do wielowiekowej tradycji browarniczej na tym obszarze.Ponadto w projekcie zaplanowano zakup wyposażenia gastronomicznego kuchni na potrzeby stałej działalności restauracyjnej jak i organizację wydarzeń i eventów. Pozwoli to na oferowanie w obiekcie potraw nawiązujących do historii regionu, ale co równie istotne także do tradycji gastronomicznych historycznych właścicieli niniejszego obiektu. Uzupełnieniem wyposażenia będ (Polish)
0 references
The project will be the subject of this project for the regeneration of the heritage park group: ZZP located in the centre of Zora, at Kościuszki 1, listed in the Register of Historical Monuments in Małopolskie Province under the following numbers: 371 of 17 May 1947, A397 of 2 December 1972 and A30078 of 20 April 1978. A number of construction and renovation works are envisaged, as well as the purchase of the necessary equipment, the equipment will not be used for the restoration of historic objects, etc., but will be used to develop a commercial function. The project is planned for the period from 01.2017 to 12.2019. the most important part of the project will be the construction work which requires a building permit. In general, they can be divided into four groups: the first is a construction work, broken down by the basement, ground floor, floor I, II, and the like, and the roof and façade. The second group refers to works that are typically plumbing, broken down by mechanical ventilation, CO installations, waxes, gas, electricity and low current installations. The other two groups are considerably smaller, but they do not fall within the 2 category. This shall include the installation of the elevator in a facility, two kitchenettes and one lift for disabled persons and the delivery of a fire. In order to provide a facility for commercial and commercial functions, the purchase of the necessary equipment is foreseen, the main cost of which is the provision of 55 HLWAR for the mini-brewery. His purchase is an important part of the spread of the Zamku in Zator, but at the same time is a reference to the brewery’s centuries-old tradition in this area. in addition, the project will purchase the catering equipment for its permanent restaurant activities as well as the organisation of events and events. This will allow the facilities to be offered in the facility for the region’s history, but also as important for the historical catering traditions of the owners of this facility. Equipment equipment (English)
0 references
Identifiers
RPMP.06.01.01-12-0162/16
0 references