THE RESTORATION OF THE HERITAGE OF THE ANCIENT ROYAL PALACE IN ŁOBZOWIE, TOGETHER WITH THE ADAPTATION TO THE NEW FUNCTIONS, WILL BE CARRIED OUT TOGETHER WITH THE PREPARATION OF THE MULTIMEDIA EXHIBITION. (Q112735)

From EU Knowledge Graph
Revision as of 08:55, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 471,658.6224 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
THE RESTORATION OF THE HERITAGE OF THE ANCIENT ROYAL PALACE IN ŁOBZOWIE, TOGETHER WITH THE ADAPTATION TO THE NEW FUNCTIONS, WILL BE CARRIED OUT TOGETHER WITH THE PREPARATION OF THE MULTIMEDIA EXHIBITION.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,965,244.26 zloty
    0 references
    2,884,512.43 zloty
    0 references
    692,282.98 Euro
    13 January 2020
    0 references
    68.13 percent
    0 references
    1 October 2016
    0 references
    30 September 2020
    0 references
    POLITECHNIKA KRAKOWSKA IM. TADEUSZA KOŚCIUSZKI
    0 references
    Budynek oraz park w otoczeniu którego znajduje się wpisany jest do rejestru zabytków pod nr A127 i A645 wpisem z 18.11.1983r..Planowany projekt obejmuje 4 zadania prowadzone w budynku tj.:1. Rewaloryzacja budynku Wydziału Architektury w zakresie elewacji budynku. W oparciu o wykonane w 2004 r. badania architektoniczne i stratygraficzne partii elewacji frontowej budynku dawnego Pałacu Królewskiego w Łobzowie, opracowano program prac konserwatorskich. Program ten został zatwierdzony przez Małopolskiego Wojewódzkiego Konserwatora Zabytków w Krakowie. Głównym jego założeniem jest zachowanie w stopniu maksymalnym jak największej ilości elementów zabytkowych i poddaniu ich technicznym i estetycznym pracom konserwatorskich. Prace konserwatorskie zostaną poprzedzone rozpoznaniem pod względem techniki i technologii zastosowanych w obiekcie materiałów. W zależności od stanu tynków elewacja zostanie poddana renowacji poprzez skucie fakturalnego narzutu i nałożeniu tynku renowacyjnego; oczyszczona z zabrudzeń i pomalowana; lub skuta i zrekonstruowana. Technologia prac i proponowane materiały zostały szczegółowo przedstawione w programie prac konserwatorskich.2. Przebudowa i zmiana sposobu użytkowania części strychu Modelarnia.Adaptacja strychu poddasza i zmiana sposobu jego użytkowania będzie wiązała prace konserwatorskie z szeregiem wymogów stawianych ze strony przyszłej funkcji wnętrza oraz jego wystroju. W projekcie skupiono się na stanie zachowania ścian, stropów i więźby dachowej, przyczynach zniszczeń, technikach i technologiach konserwatorskich. Projekt całościowy zakłada zaadaptowanie dotychczas nieużytkowego strychu na Modelarnię wraz z całym wyposażeniem oraz wykonanie nowych instalacji elektrycznych, wentylacyjnych i klimatyzacyjnych, ogrzewania, c.w.u , wodkan na potrzeby nowej funkcji. Zostanie również powiększony otwór włazu dachowego, wykonana nowa klatka schodowa oraz wykonane przeszklenie w połaci dachowej w celu doświetlenia pomieszczenia. Szczegółowy zakre (Polish)
    0 references
    The building and the park in the surroundings of which the building is located is recorded in the Register of Historical Monuments Nos A127 and A645 of 18.11.1983. the planned project comprises 4 tasks carried out in the building, i.e.: 1. Revalorisation of the building unit of the Architecture Division on the façade of the building. On the basis of the architectural research and the stratigraphic of the façade of the original building of the former Royal Palace in Łobzów, a programme of conservation work was prepared in 2004. This programme was approved by the Małopolskie Voivodeship Conservator of Monuments in Kraków. Its main aim is to maximise the greatest possible number of historic items and to undergo technical and aesthetic conservation work. The maintenance work will be preceded by a diagnosis of the technique and technology used in the facility. Depending on the condition of the redemption, the façade will be renovated by collecting a mark-up and a renovation rate; soiled and painted; and/or effect and reconstructed. The work technology and the proposed materials are presented in detail in the Conservators.2. The modification and modification of the use of the parts of the strychalnia.Adaption of the parts of the strysl of Mostrullonia.Adaption of the attic and the change in use will be linked to the maintenance work with a number of requirements for the future of the interior function and to the decoration of the interior. The project focuses on the state of walls, ceilings and roof prisoners, causes of destruction, techniques and conservation techniques. The overall design of the project is to adapt the inutility of the ramine to Modena with all its equipment and equipment and the construction of new electrical, ventilation and air-conditioning installations, heating, service water, water for the new function. It will also be enlarged the opening of the roof hatch, a new staircase, and the construction of a stopcock in the roof to illuminate the room. Detailed set (English)
    0 references

    Identifiers

    RPMP.06.01.01-12-0090/16
    0 references