Replacement of inefficient domestic heat generators in the municipality of Pucim- solid fuel (Q112460)

From EU Knowledge Graph
Revision as of 08:50, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Replacement of inefficient domestic heat generators in the municipality of Pucim- solid fuel
Project in Poland financed by DG Regio

    Statements

    0 references
    355,819.24 zloty
    0 references
    85,396.62 Euro
    13 January 2020
    0 references
    363,535.44 zloty
    0 references
    87,248.5056 Euro
    13 January 2020
    0 references
    97.88 percent
    0 references
    24 October 2017
    0 references
    30 September 2020
    0 references
    GMINA PCIM
    0 references
    0 references
    Projekt dotyczy wymiany niskosprawnych kotłów węglowych na nowe energooszczędne urządzenia węglowe i wykonaniem prac w ramach instalacji wewnętrznej. Integralną częścią projektu są działania na rzecz podniesienia świadomości ekologicznej. Stary kocioł będzie zlikwidowany i zutylizowany. redukcji emisji CO2 38,08 Emisja CO2 : przed 446,7736 , po realizacji 276,65596 Mgrok redukcji emisji pyłu PM10 96,32 i PM2,5 91,69 Emisja pyłu PM10 przed 1,632442 , po realizacji 0,0601426 Mgrok i PM2,5 przed 0,687344 i po realizacji projektu 0,05713547 Mgrok.W Gminie nie ma kotłowni zbiorczej i sieci ciepłowniczej. Projekt nie zakłada podłączenia do sieci ciepłowniczej. Nie przewiduje się budowy sieci.Planuje się następujące działania informacyjne: organizacja 2 spotkań, przygotowanie ulotek i art informacyjnych na www.pcim.pl Zad 2.Odbiorcy: mieszkańcy gminy.Działania te będą promować postawy proekologiczne oraz poczucie odpowiedzialności za stan środowiska w zakresie poprawy efektywności energetycznej, oszczędności zasobów naturalnych lub obniżenia niskiej emisji. Będą obejmować tematykę: oszczędności zasobów naturalnych; obniżenia niskiej emisji; poprawy efektywności energetycznej.Gmina nie planuje przygotowania programu osłonowego.Gmina należy do obszarów, na których konieczne jest podjęcie działań naprawczych w obowiązującym POP. Przewidziana dla gminy skala likwidacji urządzeń na paliwa stałe: 1170szt.Projekt został wskazany w PGN. PGN został zaopiniowany i uzyskał potwierdzenie WFOŚiGW.Ocena jakości powietrza w województwie zalicza Gminę do obszarów przekroczeń: pyłu PM10 24 godz. oraz BaProk.Dominującą grupą paliw w sektorze gospodarstw domowych jest węgiel: 56PGN przewiduje działanie naprawcze 3 Ograniczenie zużycia energii i wytwarzanie energii z OZE budownictwo mieszkaniowe zadania 3.2 i 3.3.Projekt nie będzie realizowany na terenie miejscowości uzdrowiskowych.Projekt odpowiada na zidentyfikowane problemy. (Polish)
    0 references
    The project concerns the exchange of low carbon coal boilers with new energy efficient coal equipment and the execution of works within an internal installation. Awareness raising activities are an integral part of the project. The old boiler will be eliminated and disposed of. CO2 38,08 emissions reduction CO2 emissions will be reduced: before 446,7736, after the implementation of 276,65596 Mg10 96,32 and PM2,5 91,69 emissions of PM emissions of PM10 before 1,632442, after the implementation of 0,0601426 Mgr and PM2,5 before 0,687344 and after the implementation of Project 0,05713547 of the Gmina Gmina does not have a boiler and a district heating network. The project does not envisage a connection to the district heating network. The following information activities are not foreseen. organisation of 2 meetings, preparation of leaflets and art at www.pcim.pl Zad 2.Recipients: local residents will promote green attitudes and a sense of responsibility for the state of the environment in terms of improving energy efficiency, saving natural resources or reducing low emissions. They will cover the following topics: the saving of natural resources; low emissions; improving energy efficiency. the municipality has no plans to draw up a cover programme for the municipality where corrective action is needed within the existing POP. The scale of the decommissioning of the solid fuel equipment planned for the municipality is as follows: 1170.The project was designated in the PGN. The PGN was given an opinion and was endorsed by the Wodnik andGWAssessment air quality in the province of Gmina in the areas of exceedance: PM10 24 hours and BaProk.Domingo in the household sector is coal: 56PGN provides for corrective action 3 The reduction of energy consumption and the production of energy from RES construction projects 3.2 and 3.3.Project will not be carried out in a spa town. the project addresses the problems identified. (English)
    0 references

    Identifiers

    RPMP.04.04.03-12-0222/17
    0 references