Thermal modernisation of public utilities in a flame — thermal renovation of the ‘A’ Building of the Team of School Complex No 3 in Płońsk (Q109029)

From EU Knowledge Graph
Revision as of 08:10, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 28,188.5664 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public utilities in a flame — thermal renovation of the ‘A’ Building of the Team of School Complex No 3 in Płońsk
Project in Poland financed by DG Regio

    Statements

    0 references
    117,452.36 zloty
    0 references
    146,815.46 zloty
    0 references
    35,235.71 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    30 November 2015
    0 references
    31 March 2017
    0 references
    POWIAT PŁOŃSKI
    0 references

    52°37'35.0"N, 20°21'51.5"E
    0 references
    Przedmiotem projektu jest termomodernizacja budynku A Zespołu Szkół Nr 3 w Płońsku. Obiekt zlokalizowany jest na działce Nr 274 położonej przy ulicy Młodzieżowej w Płońsku, Gmina Miasto Płońsk, Powiat Płoński, Województwo Mazowieckie. Właścicielem działki jest Powiat Płoński. Zespół Szkół Nr 3 składa się z budynku A (objętego projektem) oraz nowo wybudowanych budynku dydaktycznego i sali gimnastycznej. Obiekty połączone są łącznikiem. Nowo wybudowane obiekty zasilane są z miejskiej sieci ciepłowniczej. Budynek A posiada kocioł gazowy. Celem głównym projektu jest poprawa efektywności energetycznej obiektu użyteczności publicznej w powiecie płońskim– budynku A ZS Nr 3 w Płońsku. Termomodernizacja budynku A obejmuje: 1) ocieplenie obiektu: przegród zewnętrznych obiektu w tym docieplenie ścian podziemia i nadziemia 2) wymianę stolarki okiennej 3) wymianę oświetlenia na energooszczędne - montaż opraw energooszczędnych i rozdzielnic 4) modernizację c.o. poprzez montaż automatyki pogodowej 5) regulację hydrauliczną instalacji c.o. 6) montaż grzejników w pomieszczeniach gospodarczych na III kondygnacji oraz wymianą grzejników na I II i III kondygnacji wraz z montażem zaworów termostatycznych z nastawą wstępną i podpionowych oraz armatury regulacyjnej 7) zmianę zasilania na potrzeby c.o. (likwidacja kotłowni gazowej i zasilenie instalacji c.o. w budynku „A” z węzła cieplnego na parterze dobudowanego budynku ZS Nr 3 w Płońsku, który podłączony jest do miejskiej sieci ciepłowniczej). 8) zamurowanie istniejącego okna na III kondygnacji, 9) naprawę studzienek podokiennych wzdłuż ocieplanej ściany 10) wykonanie drenażu wokół budynku metodą ciśnieniową iniekcji krystalicznej z uwagi na niszczejący wpływ wód gruntowych na mury budynku (roboty izolacyjne - iniekcja ścian) 11) wykonanie dodatkowej wentylacji grawitacyjnej w pomieszczeniach gospodarczych na 3 kondygnacji 12) udrożnienie i naprawa istniejącej wentylacji. Grupa docelowa i etapy opisane w pkt. (Polish)
    0 references
    The object of the project is the thermal renovation of the premises of the Group of Schools No 3 in Płońsk. The site is located on plot No 274 located at the Youth Street in Płońsk, the Płońsk Municipality, the Płock district, the Mazowieckie Region. The owner of the plot is a ski of the flames. The Assembly of Schools No 3 consists of Building A (covered by the project) and the newly built teaching building and a gym. The sites are connected by a hyphen. Newly built plants are powered by the municipal district heating network. Building A has a gas boiler. The main objective of the project is to improve the energy efficiency of the public utility site in Płoski-Building A ZS No 3 in Płońsk. The thermal renovation of Building A comprises: (1) insulation of the site: building envelope 2) replacement of window 3 frames) replacement of window frames) replacement of lighting on energy efficient — fittings of energy-efficient luminaires and switchgear 4) modernisation of c.o. by mounting the weather conditions 5) hydraulic regulation of hydraulic heaters (6)) installation of radiators in the economic rooms on the III floor and the replacement of the radiators of I II and III floors with thermostatic valves with pre-set and sub-vertical valves and regulatory fittings (7) change of power supply for c.o. (decommissioning of the gas boiler and provision of the “A” building unit in the “A” Building from the thermal junction on the ground floor of the unloaded ZS Building No 3 in Płońsk district, which is connected to a district heating network. (8) fitting of the existing window on the 3 storey level, (9) the repair of water wells along the wall of wall 10), the drainage of the building around the building by the pressure injection method due to the impounding effect of the groundwater on the wall of the building (insulation work — wall injection) (11) execution of additional gravity ventilation at the economic premises per 3 floor 12) and repair and repair of existing ventilation. Target group and stages as described in point (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-5361/16
    0 references