Thermal modernisation of public buildings in the District of Piesaczyński District (Q109002)

From EU Knowledge Graph
Revision as of 08:09, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 1,507,864.2552 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public buildings in the District of Piesaczyński District
Project in Poland financed by DG Regio

    Statements

    0 references
    6,282,767.73 zloty
    0 references
    8,656,041.19 zloty
    0 references
    2,077,449.89 Euro
    13 January 2020
    0 references
    72.58 percent
    0 references
    15 July 2015
    0 references
    28 June 2019
    0 references
    POWIAT PIASECZYŃSKI
    0 references

    51°59'3.8"N, 21°12'50.4"E
    0 references

    52°5'0.6"N, 21°7'14.9"E
    0 references

    52°4'28.9"N, 21°1'37.6"E
    0 references
    Celem Projektu jest zwiększenie efektywności energetycznej i poprawa jakości powietrza poprzez poprawę parametrów energetycznych budynków użyteczności publicznej na terenie Powiatu Piaseczyńskiego (PP). Projekt realizowany będzie w partnerstwie PP (Lider) i Gmin: Konstancin-Jeziorna (KJ) i Góra Kalwaria (GK) -Partnerzy, w 8 budynkach użyteczn. publicznej zlokalizowanych na terenie Powiatu Piaseczyńskiego, w tym 5 budynkach należących do PP, 1 – do Gminy KJ i 2-do Gminy GK. Zakres rzeczowy projektu obejmuje termomodernizację następujących obiektów: budynku Starostwa przy ul. Czajewicza 2/4 w Piasecznie (popr. efektywn.energet (EN) - o 84,43%), budynku LO im. I Dywizji Kościuszkowskiej w Piasecznie (EN- 65,31%), budynku szkoły ZS RCKU w Piasecznie (EN- 51,20%), 2 budynków DPS w KJ (1 wolnostoj i 3 połącz - EN od 68,45- do 86,84%). Wszystkie budynki spełniają zatem Kryterium Dostępu (KD) nr 3. Zakres prac służących poprawie efektywności energetycznej określono na podstawie audytów energetycznych (KD nr 1). Cel zostanie osiągnięty poprzez kompleksowe działania termomodernizacyjne, w tym odpowiednio: ocieplenie przegród zewnętrznych obiektu, w tym ścian zewnętrznych, dachów lub stropodachów, wymianę okien/drzwi zewnętrznych , wymianę oświetlenia na energooszczędne, przebudowę systemów grzewczych,budowę systemów wentylacji i klimatyzacji wraz z rekuperacją , zastosowanie automatyki pogodowej , instalację mikrokogeneracji na potrzeby własne , instalację OZE, instalację indywidualnych liczników ciepła oraz c.w.u., instalację zaworów podpionowych i termostatów. W wyniku realizacji projektu nastąpi poprawa efektywności energetycznej dla budynków objętych działaniami termomoderniz. o 64,46% (KMS nr 1). Koszty kwalifikowalne projektu obejmują tylko zadania wskazane w audytach energetycznych (KD nr1). Wnioskodawca wykona audyt energetyczny ex-post (KD nr 2). Projekt jest zgodny z dyrektywami wskazanymi w KD nr 5 oraz przepisami wskazanymi w KF nr 5. (Polish)
    0 references
    The aim of the project is to increase energy efficiency and improve air quality by improving the energy performance of public buildings in the area of sandy County (PP). The project will be implemented in a PP/Commons Partnership: Konstancin-Jeziorna (KJ) and Góra Kalwaria (GK) -Partners, in 8 utility buildings located in the District of Piaseczyński District, including 5 buildings belonging to PP, 1 to the municipality of J and 2 to GK Municipality. The scope of the project involves the thermal modernisation of the following facilities: the building of the Starol building at ul. In Piaseczno 2/4 in Piaseczno (EN for energy efficiency (EN) — by 84.43 %), the LO in Piaseczno (EN- 65.31 %), the ZS RCU school building in Piaseczno (EN- 51.20 %), 2 DPS buildings in KJ (1 free-standing and 3 joints — EN 68,45- to 86.84 %). Therefore, all buildings meet the Access Criterion (KD) No 3. The scope of energy efficiency improvement work was determined on the basis of energy audits (KD No 1). The objective will be achieved through comprehensive thermo-modernisation activities including, as appropriate: insulation of the building envelope, including external walls, roofs or tuning, the replacement of external windows/doors, replacement of lighting with energy-efficient, upgrading of heating systems, construction of ventilation and air conditioning systems with recuperation, application of weather automation, installation of micro-cogeneration for own use, installation of RES installations, installation of individual heat meters and hot service hot water equipment, installation of sub-vertical valves and thermostats. As a result of the project, energy efficiency will be improved for buildings under thermo-modernisation activities by 64.46 % (RBM 1). The eligible costs of the project cover only the tasks indicated in the energy audits (KD No 1). The applicant will perform ex-post energy audits (KD No 2). The project complies with the directives indicated in KD No 5 and the provisions of KF No 5. (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-5323/16
    0 references