Construction of a sewage system with two sewage pumping stations in Kamionice — stage IV (Q105647)

From EU Knowledge Graph
Revision as of 22:48, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a sewage system with two sewage pumping stations in Kamionice — stage IV
Project in Poland financed by DG Regio

    Statements

    0 references
    1,788,890.67 zloty
    0 references
    429,333.76 Euro
    13 January 2020
    0 references
    2,104,577.27 zloty
    0 references
    505,098.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 April 2017
    0 references
    31 December 2019
    0 references
    GMINA KAMIONKA
    0 references
    0 references
    Przedmiotem projektu jest budowa kanalizacji sanitarnej w miejscowości Kamionka, na terenie aglomeracji Kamionka. Wybudowana zostanie sieć grawitacyjna i tłoczna o długości 4673,5 m z dwiema przepompowniami ścieków (długość kanalizacji w aglomeracji = 3730 m, długość sieci poza aglomeracją - 943,5m). W projekcie zaplanowano 106 podłączeń, co umożliwi korzystanie z systemu kanalizacji sanitarnej 498 osobom (techniczna możliwość przyłączeni, które obecnie nie są podłączone do sieci. Projekt ma charakter kolejnego etapu prac związanych z rozbudową kanalizacji w aglomeracji Kamionka. Głównym problemem na tym terenie jest wysoki poziom zwodociągowania, a jednocześnie występujące deficyty w dostępie do sieci. Działki objęte niniejszym projektem są już zwodociągowane, a brak jest na nich dostępu do kanalizacji sanitarnej. Celem projektu jest poprawa proporcji pomiędzy siecią wodociągową, a kanalizacyjną, co doprowadzi do zapewnienia właściwej gospodarki wodno-ściekowej na terenie aglomeracji Kamionka. Zadania zaplanowane w projekcie mają charakter prac budowlanych związanych z budową kanalizacji. Zadania podzielone są na prace dotyczące sieci i przepompowni ścieków. Grupą docelową efektów projektu są: - mieszkańcy zainteresowani podłączeniem do sieci kanalizacji - uzyskają oni dostęp do usługi odbioru ścieków - Gmina Kamionka, która jest ustawowo odpowiedzialna za gospodarkę komunalną na swoim terenie, w tym uporządkowanie gospodarki wodno-ściekowej w aglomeracji Kamionka - dzięki projektowi zwiększy się wskaźnik skanalizowania tej aglomeracji. Ponadto Gmina przybliży się do osiągnięcia celu zapewniania na swoim terenie właściwej infrastruktury technicznej, Realizacja projektu doprowadzi do osiągnięcia w okresie trwałości wskaźników: - rezultatu "Przewidywana liczba osób korzystających z ulepszonego oczyszczania ścieków": 498 osób - produktu "Długość wybudowanej kanalizacji sanitarnej": 3,73 km. (Polish)
    0 references
    The object of the project is the construction of a sanitary sewage system in stoneware within the stoneware agglomeration. A gravity and pressure network of 4 673.5 m will be built with two sewage pumping stations (length of sewage in the agglomeration = 3 730 m, length of net outside agglomeration — 943.5 m). 106 connections are planned for the project, which will make it possible to use the sanitary sewage system of 498 persons (technically connected capacity which is currently not connected to the grid). The project is the next step in the development of a sewerage system in the agglomeration of stoneware. A major problem in this area is the high level of activation and at the same time deficits in network access. The plots of land covered by this project are already deposited, and there is no access to the sanitary sewage system. The aim of the project is to improve the ratio between the water supply system and the sewerage system, which will lead to the proper treatment of water and wastewater management in the area of the agglomeration of stoneware. The tasks planned in the project are of construction work relating to the construction of a sewerage system. Tasks are divided into work on the network and wastewater pumping stations. The target group of the project results shall be: — residents interested in connecting to the collecting system — access to the sewage collection service — the stoneware municipality, which is legally responsible for the municipal management on its territory, including the cleaning up of the water and wastewater management in the agglomeration of stoneware — will result in a widening indicator of the treatment of the agglomeration. In addition, the Municipality will further the achievement of the objective of providing the appropriate technical infrastructure at its premises, and the project implementation will lead to the achievement of indicators during the lifetime of the indicators: Result “Repeat the number of people benefiting from an improved waste water treatment”: 498 persons — product “Length of sanitary sewerage built”: 3.73 km. (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0042/17
    0 references