Construction of a water treatment plant in the village of Godów (Q105612)

From EU Knowledge Graph
Revision as of 22:42, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 193,697.9976 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a water treatment plant in the village of Godów
Project in Poland financed by DG Regio

    Statements

    0 references
    807,074.99 zloty
    0 references
    949,500.0 zloty
    0 references
    227,880.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 February 2017
    0 references
    20 December 2018
    0 references
    GMINA FIRLEJ
    0 references
    0 references
    Zakres projektu obejmuje budowę stacji uzdatniania wody w miejscowości Czerwonka Gozdów gm. Firlej. Powstała infr. zapewni potrzeby wodociągu gminnego zaopatrującego nieruchomości w wodę na cele bytowo-gospodarcze i przeciwpożarowe. Z powodu wzrastającego zużycia wody mieszkańców gminy oraz szczególnie odczuwalnych spadków ciśnienia na sieci w okresach wiosenno-letnich (napływ turystów) zachodzi potrzeba przebudowy i uruchomienia SUW. SUW powstanie na działce istniejącej stacji wod. obecnie nieczynnej ze względu na zanik wydajności studni głębinowej oraz znaczne zanieczyszczenia fizykochemiczne wody. W wyniku realizacji projektu planuje się budowę stacji uzdatniania wody, która będzie pobierać wodę ze zbiornika wód PLPLGW230084.Utworzona infrastruktura umożliwi procesy uzdatniania w celu spełnienia wymagań jakości wód na potrzeby zaopatrzenia mieszkańców, na cele socjalno-bytowe,pompowania zasili wodociąg zaopatrujący poszczególnych odbiorców. Zastosowane nowe rozwiązania pozwolą na uzdatnienie wód gruntowych do poziomu speł. normy Rozp. Ministra Zdrowia. W ramach projektu przewidziano również zastosowanie OZE do zasilenia bieżących potrzeb instalacji oraz portal komunikacyjny.W celu minimalizacji skutków zagrożeń/ awarii instalacji oraz rozliczeń zużycia wody z działem sprzedaży w projekcie przewidziano również system monitoringu pracy instalacji i urządzeń z systemem powiadamiania o stanach krytycznych. Rezultatem wprowadzonych działań będzie wzrost liczby osób korzystających z ulepszonego systemu zaopatrzenia w wodę. Realizacja projektu będzie zaspokajała potrzeby grupy docelowej poprzez poprawę jakości życia, a także polepszenie dostępu do infrastruktury wodno-kan, co jednocześnie podniesie atrakcyjność inw. obszaru i stworzy korzystne warunki do prowadzenia działalności gospodarczej i mieszkalnictwa przy jednoczesnej poprawie stanu ś. naturalnego. Wsparta infrastruktura posiada w pełni zapewniony wymóg związany z prawidł. zagospodarowaniem powstałych ścieków. (Polish)
    0 references
    The project covers the construction of a water treatment plant in the village of Gozdnów gm. Firleu. The purpose of the infusion will be to ensure that a municipal water supply is needed for residential and firefighting water. Due to the increasing water consumption of the municipalities, and due to the particularly appreciable falls in pressure on the network during the summer/summer periods (arrivals of tourists), there is a need to rebuild and operate the SUW. It will be built on the existing station of the existing station, which is currently inactive due to the disappearance of the productivity of the deep water wells and the significant chemical pollution of the water. The project will result in the construction of a water treatment plant, which will take water from the PLPLGW230084.Ugenerated infrastructure, will enable the treatment to be made to meet the water quality requirements for the supply of the inhabitants, for the purposes of social housing, for the pumping station of the mains supply. The new solutions used will allow ground water to meet the level. The Minister for Health. The project also foresees the use of RES to reinforce the current needs of an installation and a communication portal. in order to minimise the effects of the hazards/breakdown of the installation and the billing of water consumption with the sales unit, the project also foresees a system for monitoring the operation of the installation and equipment with the emergency notification system. The measures will result in an increase in the number of people benefiting from an improved water supply system. The project will meet the needs of the target group by improving the quality of life, as well as improving access to water and water infrastructure, which will at the same time increase the attractiveness of the area and create favourable conditions for economic activity and housing, while improving the natural environment. The infrastructure is fully supported by the requirement of irregularities. management of the waste water generated. (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0022/17
    0 references