Environmental protection through investments in water and wastewater infrastructure in Bełżac (Q105602)

From EU Knowledge Graph
Revision as of 22:41, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 344,609.8872 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Environmental protection through investments in water and wastewater infrastructure in Bełżac
Project in Poland financed by DG Regio

    Statements

    0 references
    1,435,874.53 zloty
    0 references
    1,689,264.23 zloty
    0 references
    405,423.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 July 2016
    0 references
    30 October 2020
    0 references
    GMINA BEŁŻEC
    0 references
    Celem głównym projektu jest "Poprawa stanu gospodarki wodno-ściekowej na terenie Gminy Bełżec przyczyniająca się do poprawy stanu wód gruntowych jak i powierzchniowych, minimalizacji zagrożeń epidemiologicznych oraz zmniejszenia zanieczyszczenia środowiska naturalnego". Realizacja projektu umożliwi poprawę stanu infrastruktury technicznej (wodno-kanalizacyjnej) oraz zapobiegnie degradacji środowiska naturalnego, które stanowi podstawę potencjału rozwoju Gminy i wpływa zdecydowanie na podniesienie jakości życia mieszkańców. Grupą docelową, która odniesie bezpośrednie korzyści z realizacji projektu na poziomie jego realizacji będą: * mieszkańcy Gminy Bełżec * instytucje oraz organizacje znajdujące się w Gminie Bełżec * firmy, przedsiębiorcy oraz osoby prowadzące działalność gospodarczą w obrębie Gminie Bełżec * instytucje oraz organizacje znajdujące się na terenie Gminy Bełżec. Planowane przedsięwzięcie obejmuje: 1) Budowę sieci wodociągowej, 2) Budowę sieci kanalizacji sanitarnej podciśnieniowej. Powyższe działania mają na celu skanalizowanie domostw położonych w miejscowości Bełżec. W wyniku realizacji projektu zostaną osiągnięte poniższe wskaźniki rezultatu: 1) Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków - 2 osoby, 2) Przewidywana liczba osób korzystających z ulepszonego oczyszczania ścieków - 92 osób, 3) Przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę - 150 osób, 4) Wybudowana sieć kanalizacyjna o łącznej długości 0,987 km. 5) Długość wybudowanej sieci wodociągowej -1,549 km, 6) Wydajność dobowa wybudowanych ujęć wody - 18,665 m3/dobę, 7) Liczba wspartych stacji uzdatniania wody - 1 szt. (Polish)
    0 references
    The main objective of the project is to ‘improve water and wastewater management in the municipality of Bełowice in order to improve the status of groundwater as well as surface waters, minimise epidemiological risks and reduce environmental pollution’. The implementation of the project will make it possible to improve the state of the technical infrastructure (water and sanitation) and to prevent environmental degradation, which is the basis for the development potential of the municipality and contributes decisively to the improvement of the quality of life of the inhabitants. The target group which will benefit directly from the implementation of the project at the level of its implementation will be: * the residents of Bełowac * institutions and organisations located in the municipality of Bełągc (*), entrepreneurs and persons engaged in business activities within the municipality of Bełągica * institutions and organisations located in the commune of Bełąc. The project shall consist of the following: 1) Construction of water supply network, 2) Construction of a vacuum sanitary sewage system. The above activities are aimed at the analysis of domains in Bełżac. As a result of the project, the following result indicators will be achieved: (1) Number of additional persons benefiting from an improved waste water treatment — 2 persons, 2) Repredicted number of persons benefiting from an improved waste water treatment — 92 persons, 3) Repredicted number of persons benefiting from an improved water supply, 150 persons, 4) Reprojected sewage network with a total length of 0.987 km. 5) Length of water supply network constructed — 1.549 km, 6) diurnal water supply capacity — 18.665 m³/day, 7) Number of water purification plants supported — 1. (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0017/17
    0 references