THERMO-MODERNISATION OF THE POZKALNO BUILDING — SERVICES IN OMUNACACHS (Q101920)

From EU Knowledge Graph
Revision as of 22:15, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 30,472.262399999996 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
THERMO-MODERNISATION OF THE POZKALNO BUILDING — SERVICES IN OMUNACACHS
Project in Poland financed by DG Regio

    Statements

    0 references
    126,967.76 zloty
    0 references
    149,373.84 zloty
    0 references
    35,849.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 November 2017
    0 references
    31 December 2018
    0 references
    GMINA GOMUNICE
    0 references

    51°10'10.6"N, 19°29'7.8"E
    0 references
    PROJEKT POLEGA NA GŁĘBOKIEJ TERMOMODERNIZACJI BUDYNKU UŻYTECZNOŚCI PUBLICZNEJ NA TERENIE GMINY GOMUNICE. ZAKRES PRZEDSIĘWZIĘCIA DOTYCZY KOMUNALNEGO BUDYNKU MIESZKALNO-USŁUGOWEGO. OBIEKT JEST ZLOKALIZOWANY W MIEJSCOWOŚCI GOMUNICE PRZY ULICY WITOSA 1. W BUDYNKU ZNAJDUJĄ SIĘ LOKALE MIESZKALNE (I I II PIĘTRO) ORAZ PRZEWIDZIANO UTWORZENIE GMINNEGO ŻŁOBKA(PARTER). ZE WZGLĘDU NA SWOJE PRZEZNACZENIE ODGRYWA ON BARDZO WAŻNA ROLĘ W ŻYCIU LOKALNEJ SPOŁECZNOŚCI. W OBIEKCIE PLANUJE SIĘ OCIEPLENIE ŚCIAN ZEWNĘTRZNYCH, STROPU OSTATNIEJ KONDYGNACJI ORAZ WYMIANĘ OKIEN W PIWNICY BUDYNKU. CELEM PROJEKTU JEST POPRAWA EFEKTYWNOŚCI ENERGETYCZNEJ. DZIĘKI REALIZACJI INWESTYCJI ROCZNE ZMNIEJSZENIE ZAPOTRZEBOWANIA NA ENERGIĘ WYNIESIE 70,1% CO WYNIKA Z PRZEPROWADZONEGO AUDYTU ENERGETYCZNEGO. Z BUDYNKU KORZYSTAĆ BĘDZIE 3 OPIEKUNÓW DZIECI DO LAT 3, A PRZEWIDYWANA ILOŚĆ MIEJSC OPIEKI TO 18 DZIECI. PONADTO BUDYNEK ZAMIESZKUJE 9 OSÓB, A MAKSYMALNIE MOŻE ZAMIESZKIWAĆ 15 OSÓB. ZE WZGLĘDU NA CHARAKTER BUDYNKU GRUPĄ DOCELOWĄ BĘDĄ STANOWIĆ WSZYSCY MIESZKAŃCY GMINY W ILOŚCI 5 876 OSÓB. NA PROJEKT SKŁADAĆ SIĘ BĘDĄ NASTĘPUJĄCE ZADANIA: 1. PRZYGOTOWANIE PROJEKTU - W RAMACH ZADANIA PRZEZ JEDNOSTKĘ PROJEKTOWĄ PRZYGOTOWANA ZOSTAŁA DOKUMENTACJA TECHNICZNA 2. TERMOMODERNIZACJA BUDYNKU MIESZKALNO-USŁUGOWEGO W GOMUNICACH - W RAMACH ZADANIA PLANOWANE SĄ PRACE TERMOMODERNIZACYJNE OBEJMUJĄCE: OCIEPLENIE ŚCIAN ZEWNĘTRZNYCH I STROPU OSTATNIEJ KONDYGNACJI ORAZ WYMIANĘ OKIEN W PIWNICY BUDYNKU. 3. ZARZĄDZANIE PROJEKTEM I JEGO OBSŁUGA - NADZÓR INWESTORSKI ORAZ PROMOCJA PROJEKTU PROJEKT BĘDZIE REALIZOWANY ZGODNIE Z ZASADAMI UNIWERSALNEGO PROJEKTOWANIA, ZGODNIE Z „WYTYCZNYMI W ZAKRESIE REALIZACJI ZASADY RÓWNOŚCI SZANS I NIEDYSKRYMINACJI, W TYM DOSTĘPNOŚCI DLA OSÓB Z NIEPEŁNOSPRAWNOŚCIAMI ORAZ ZASADY RÓWNOŚCI SZANS KOBIET I MĘŻCZYZN W RAMACH FUNDUSZY UNIJNYCH NA LATA 2014-2020”. PLANOWANE DO ZASTOSOWANIA W PROJEKCIE ROZWIĄZANIA TECHNICZNE BĘDĄ UŻYTECZNE DLA WSZYSTKICH BEZ POTRZEBY ADAPTACJI LUB SPECJALISTYCZNEGO PR (Polish)
    0 references
    THE PROJECT INVOLVES DEEP THERMAL RENOVATION OF THE PUBLIC BUILDING IN THE MUNICIPALITY OF GOMUNICE. THE PROJECT CONCERNS A MUNICIPAL HOUSING AND SERVICES BUILDING. THE SITE IS LOCATED IN THE MUNICIPALITY OF GOMUNICE AT ULICA WITOSA 1. THE BUILDING HOUSES HOUSING (AND 2ND FLOOR) AND PROVIDES FOR THE CREATION OF A MUNICIPAL CRÈCHE. DUE TO THEIR INTENDED USE, IT PLAYS A VERY IMPORTANT ROLE IN THE COMMUNITY’S LIVES. THE FACILITY IS DESIGNED TO WARMING THE OUTER SIDES, THE CEILING OF THE LAST FLOOR AND THE REPLACEMENT OF WINDOWS IN THE BASEMENT OF THE BUILDING. THE AIM OF THE PROJECT IS TO IMPROVE ENERGY EFFICIENCY. THANKS TO THE IMPLEMENTATION OF THE INVESTMENT, AN ANNUAL REDUCTION IN ENERGY DEMAND WILL REACH 70.1 % AS A RESULT OF THE ENERGY AUDIT CARRIED OUT. THE BUILDING WILL BE USED BY 3 CARERS OF CHILDREN UP TO THE 3S AND 18 CHILDREN. IN ADDITION, THE BUILDING IS HOME TO 9 PEOPLE AND UP TO A MAXIMUM OF 15 PEOPLE. DUE TO THE NATURE OF THE BUILDING, THE TARGET GROUP WILL BE MADE UP OF 5 876 PEOPLE IN THE MUNICIPALITY. THE PROJECT WILL COMPRISE THE FOLLOWING TASKS: 1. PROJECT PREPARATION — TECHNICAL DOCUMENTATION 2 HAS BEEN PREPARED AS PART OF THE PROJECT UNIT. THE THERMAL RENOVATION OF THE HOUSING AND SERVICES BUILDING IN OMUNICACHS — AS PART OF THE TASK, THERMAL MODERNISATION WORKS ARE PLANNED, INCLUDING: THE INSULATION OF THE OUTER WALLS AND THE CEILING OF THE LAST FLOOR AND THE REPLACEMENT OF WINDOWS IN THE BASEMENT OF THE BUILDING. 3. PROJECT MANAGEMENT AND MAINTENANCE — INVESTOR SUPERVISION AND PROJECT PROMOTION WILL BE CARRIED OUT IN ACCORDANCE WITH THE PRINCIPLES OF UNIVERSAL DESIGN, IN ACCORDANCE WITH THE “GUIDELINES FOR THE IMPLEMENTATION OF THE PRINCIPLE OF EQUAL OPPORTUNITIES AND NON-DISCRIMINATION, INCLUDING ACCESSIBILITY FOR PERSONS WITH DISABILITIES AND THE PRINCIPLE OF EQUAL OPPORTUNITIES FOR WOMEN AND MEN IN UNION FUNDS 2014-2020”. PLANNED TO BE USED IN A DRAFT TECHNICAL SOLUTION WILL BE USEFUL FOR ALL WITHOUT THE NEED FOR ADAPTATION OR SPECIALISED PR (English)
    0 references

    Identifiers

    RPLD.04.02.02-10-0019/17
    0 references