Modernisation of the wastewater treatment plant with the construction of a sewage system in the agglomeration of Cybinka (Q100397)

From EU Knowledge Graph
Revision as of 21:26, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 491,328.6864 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the wastewater treatment plant with the construction of a sewage system in the agglomeration of Cybinka
Project in Poland financed by DG Regio

    Statements

    0 references
    2,047,202.86 zloty
    0 references
    2,408,474.0 zloty
    0 references
    578,033.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2017
    0 references
    31 January 2020
    0 references
    ZAKŁAD USŁUG KOMUNALNYCH CYBINKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    52°11'38.4"N, 14°47'48.8"E
    0 references
    Proj polega na realiz. działań wspierających gospodarkę wodno-ściekowej. Przedmiot. proj. jest budowa sieci kanalizacji sanitarnej i modernizacja oczyszczalni ścieków w m. Cybinka. W ramach zad. zost. zrealiz.: 1. Sieć kanalizacji sanitarnej w Cybince, ul. Grunwaldzka/Wileńska o łącznej dł. 0,4225 km – inwestycja w trakcie realiz. (na pełnej dokumentacji) 2. Sieć kanalizacji sanitarnej grawitacyjno- tłocznej o łącznej dł. ok. 0,85 km w Cybince, w tym. m.in. budowa 1 przepompowni ścieków oraz 3 szt. przyłączy kanalizacyjnych; 3. Modernizacja oczyszczalni ścieków w miejscowości Cybinka o przepustowości docelowej 600m3/d. Inwestycja nr 1 jest realiz. na pełnej dokument - budowa jest rozpoczęta. Inwestycje nr 2 i 3 – jest przygot. PFU na pełen zakres tych inwestycji. Inwest. te będą realiz. w trybie "zaprojektuj i wybuduj’. Gr docelowe: Mieszk Aglom Cybinka Mieszk. Gm. Cybinka i Powiatu Słubickiego Władze Gm. Cybinka Gł celem proj. jest poprawa dostępu do dobrej jakości infrastruktury kanalizacyjnej na obszarze Gm. Cybinka. cele szcz.: • Poprawa jakości oczyszczania ścieków na obszarze Gm. Cybinka, poprzez Modernizację oczyszczalni ścieków w Cybince i poprawę jej parametrów • Poprawa dostępu mieszkańców Aglom Cybinka do infrastr kanaliz, poprzez budowę 1272,5 m kanalizacji sanit. • Zwiększ liczby RLM przyłączonych do sieci w Aglom. Cybinka o 62 RLM Wskaźn produkt: • Dł. sieci kanalizacji sanit. (km) – 0,69 • Dł. wybudow. kanalizacji sanit. (km) – 0,69 • L.wyremont. oczyszczalni ścieków komunal. (szt.) – 1 Wskaźn.rezult: • L. dodatk. os. korzyst. z ulepszonego oczyszczania ścieków (CI 19) (RLM) - 62; • Przewid. l. os. Korzyst. z ulepszonego oczyszczania ścieków (RLM) – 3 313 • Wielkość ładunku ścieków poddanych ulepszonemu oczyszczaniu (RLM) – 3 313 • Wzrost zatrudnienia we wspieranych przedsięb. O/K/M (CI 8) (EPC) – 1 / 0 / 1[...] (Polish)
    0 references
    Proj is implemented. activities in support of water and wastewater management. The construction of sewage systems and the modernisation of the sewage treatment plant in Cybinka are to be constructed. The following activities will be carried out in the framework of. 1. The sanitary sewage system in Cybince, ul. Cumulated length of Grunwaldzka/Willeńska 0.4225 km — investment in the process of implementation. (for full dossier) 2. Combined gravity sanitary sewerage network with a total length of approximately 0.85 km in Cybince, including the construction of 1 sewage pumping stations and 3 sewer connections; 3. The modernisation of the wastewater treatment plant in the municipality of Cybinka with a target capacity of 600 m³/d. investment No 1 is implemented. Investment No 2 and No 3 is an adventure. PFU for the full range of these investments. These will be implemented. GR Target: Smoking in Cybinka Agm Cybinka. The Glam Cybinka and Słubice District authorities improve access to good quality sewage infrastructure in the Gm. • Improvement of the quality of waste water treatment in the Gm. • Increase the number of p.e. connected to the network. Cybinka by 62 p.e. • Length of the sewerage system. (km) — 0,69• Length of construction built. (km) — 0,69• T. (items) — 1 Indicators of results: • L. positive water treatment (CI 19) (p.e.) — 62; • Laying. Improved wastewater treatment (p.e.) — 3 313• Number of waste water load under improved treatment (p.e.) — 3 313• Increase in employment in supported wastewater. O/K/M (CI 8) — 1/0/1 [...] (English)
    0 references

    Identifiers

    RPLB.04.03.00-08-0017/17
    0 references