Modernisation of street lighting in the municipality of Bukowwiec with energy efficient, green equipment (Q98291)

From EU Knowledge Graph
Revision as of 21:13, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of street lighting in the municipality of Bukowwiec with energy efficient, green equipment
Project in Poland financed by DG Regio

    Statements

    0 references
    453,671.09 zloty
    0 references
    108,881.06 Euro
    13 January 2020
    0 references
    620,956.88 zloty
    0 references
    149,029.65 Euro
    13 January 2020
    0 references
    73.06 percent
    0 references
    1 October 2016
    0 references
    31 October 2019
    0 references
    GMINA BUKOWIEC
    0 references
    Przedmiotem projektu jest modernizacja oświetlenia ulicznego przy ul. Dworcowej oraz Ceynowy poprzez budowę nowych punktów świetlnych. Celem projektu jest poprawienie efektywności energetycznej systemu oświetleniowego poprzez zastosowanie bardziej energooszczędnych opraw oświetleniowych oraz zastosowanie systemu sterowania z możliwością zredukowania mocy opraw w okresie cyklu, w którym nie jest wymagany maksymalny strumień świetlny. Celem modernizacji jest również dostosowanie parametrów oświetlenia ulicznego do obowiązujących przepisów prawnych.Całkowite nakłady inwestycyjne projektu pn. ,,Modernizacja oświetlenia ulicznego na terenie Gminy Bukowiec na urządzenia energooszczędne, proekologiczne” wynoszą 647 836,88 zł. Zakres rzeczowy przedmiotowej inwestycji został określony na podstawie opracowanego audytu energetycznego w zakresie oświetlenia ulicznego.Na całkowite koszty inwestycji składają się następujące wydatki:• Przygotowanie dokumentacji technicznej wraz z audytem;• Przygotowanie studium wykonalności;• Nadzór inwestorski;• Roboty budowlane i instalacyjne;• Promocja projektu.Nie wszystkie koszty w ramach projektu są kwalifikowane. Do kosztów kwalifikowanych zaliczany roboty budowlane i instalacyjne oraz nadzór inwestorski. Pozostałe wydatki są kosztami niekwalifikowanymi w projekcie. Realizację inwestycji zaplanowano na lata 2016-2019. Projekt nie jest objęty pomocą publiczną. (Polish)
    0 references
    The project aims to modernise street lighting at ul. Stations and Ceynowa through the construction of new lighting points. The aim of the project is to improve the energy efficiency of the lighting system by applying more energy-efficient luminaires and to use the control system with the possibility of reducing the force of luminaires during a cycle where the maximum luminous flux is not required. The purpose of the upgrade is also to adapt the street lighting parameters to the applicable legal provisions.Total investment expenditure of the project ‘The modernisation of street lighting in the municipality of Bukowwiec with an energy-efficient device, green’ amounts to PLN 647 836,88. The material scope of the investment has been determined on the basis of an energy audit in the field of street lighting. the total investment costs consist of the following expenditure:• Preparation of the technical file with the audit;• Preparation of the feasibility study;• Preparation of the feasibility study;• Preparation of the feasibility study;• Engineering for engineering;• Construction and installation works;• Design promotion. not all costs of the project are eligible. The eligible costs shall be the eligible costs of construction and installation work and investor supervision. The remaining expenditure is ineligible in the project. The investment is planned for 2016-2019. The project is not covered by State aid. (English)
    0 references

    Identifiers

    RPKP.03.04.00-04-0012/18
    0 references