Construction of the energy efficient building in the rural community in metres. (Q95561)

From EU Knowledge Graph
Revision as of 21:07, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the energy efficient building in the rural community in metres.
Project in Poland financed by DG Regio

    Statements

    0 references
    430,096.2 zloty
    0 references
    103,223.09 Euro
    13 January 2020
    0 references
    672,025.31 zloty
    0 references
    161,286.07 Euro
    13 January 2020
    0 references
    64.0 percent
    0 references
    11 March 2016
    0 references
    23 November 2018
    0 references
    GMINA GRĘBOCICE
    0 references
    Projekt polega na budowie świetlicy w miejscowości Świninio gm. Grębocice. Obiekt ma mieć charakter demonstracyjny poprzez budowę obiektu o znacznie podwyższonych parametrach charakterystyki energetycznej i udostępnianie go do wglądu zainteresowanym tematyką oszczędności energetycznej. Wnioskodawcą, inwestorem oraz operatorem projektu jest Gmina Grębocice. W ramach budowy budynku świetlicy zastosowane zostaną rozwiązania o lepszych parametrach w stosunku do budynku referencyjnego WT2021. Położenie i kształt budynku zaprojektowano zgodnie z zasadą budynków pasywnych. Ogrzewanie obiektu realizowane zostanie z sieci elektrycznej z uwagi na brak możliwości włączenia obiektu do sieci gazowej lub ciepłowniczej. Płyta fundamentowa z PERIPORU izoluje budynek od gruntu a jednocześnie jest obojętna na środowisko wodne w gruncie. Ściany zewnętrzne z elementów NEOPOROWYCH tworzą jednolitą strukturę po wypełnieniu betonem. Konstrukcja dachu i stropu międzykondygnacyjnego w całości zostanie zwieńczona prefabrykowaną konstrukcją dachową z wiązarów dachowych z przygotowanego wcześniej, wyselekcjonowanego drewna, poddanego obróbce, wysuszonego i zaimpregnowanego przeciw szkodnikom i grzybom. Stolarka okienna została zaprojektowana na profilach min 5 komorowych z pakietem 3 szybowym o podwyższonych parametrach izolacyjnych. Wentylacje obiektu została zaprojektowana mechaniczna z odzyskiem ciepła. Zastosowano również oświetlenie ledowe, instalację paneli fotowoltaicznych mocy 1 kW. Zaprojektowano na ścianie wschodniej ścianę zielona z roślinnością mocno rozwijającą się w pionie. W ramach prac budowlanych będzie wybrany wykonawca robót w przetargu nieograniczonym. W realizację projektu będą zaangażowani pracownicy Urzędu Gminy Grębocice zgodnie z ich merytorycznym przygotowaniem. Dodatkowo przewidziano udział inspektora nadzoru, którego zadaniem będzie kontrola zgodności przeprowadzanych robót z dokumentacją projektu budowlanego. (Polish)
    0 references
    The project consists of the construction of a day-care centre in the village of Śnienio gm. Grębocice. The facility is intended to be a demonstration by building a facility with significantly improved energy performance parameters and making it available for consultation by interested energy savings. The applicant, the investor and the operator of the project are Gmina Gębocice. In the construction of the building, a better performance solution will be applied to the WT2021 reference building. The location and shape of the building is designed in accordance with the passive building principle. The installation will be heated from the electricity grid due to the impossibility to include the facility in the gas or district heating network. The foundation plate from the ground is insulating the building from the ground and, at the same time, is indifferent to the aquatic environment in the ground. The external walls of the NEW components form a single structure once the concrete has been filled. The construction of the roof and the basement of the basement floors will be completed in full by the finished prefabricated construction of roof tiles made of previously prepared, selected, processed and impregnated wood, prepared and impregnated with pests and fungi. The window frames have been designed for a minimum of 5 windows with a package of 3 shafts with enhanced insulation parameters. The works of the site have been designed to be mechanical with heat recovery. LED lighting has also been used, installation of solar panels of power photovoltaic power of 1 kW. A green wall has been designed on the eastern wall with a strongly developed side. As part of the construction work, the contractor will be selected to carry out the works in an open tender. The staff of the Gębocice local authority will be involved in the implementation of the project in accordance with the substance of the project. In addition, a supervisory inspector will be involved in order to check the conformity of works carried out with the documentation of the construction project. (English)
    0 references

    Identifiers

    RPDS.03.03.01-02-0098/16
    0 references