Reconstruction of the intersection of DK 19 (al. Solidarity and al. Gen. It. Sikorski) and DW 809 (ul. Gen. Spirit in Lublin — removal of traffic towards the Lublin Czechs interchange (S12/S17/S19) (Q88468)

From EU Knowledge Graph
Revision as of 19:28, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 14,144,672.4696 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the intersection of DK 19 (al. Solidarity and al. Gen. It. Sikorski) and DW 809 (ul. Gen. Spirit in Lublin — removal of traffic towards the Lublin Czechs interchange (S12/S17/S19)
Project in Poland financed by DG Regio

    Statements

    0 references
    58,936,135.29 zloty
    0 references
    69,860,847.48 zloty
    0 references
    16,766,603.4 Euro
    13 January 2020
    0 references
    84.36 percent
    0 references
    15 April 2016
    0 references
    31 January 2018
    0 references
    GMINA LUBLIN
    0 references
    0 references
    Projekt dotyczy przebudowy skrzyżowania ulic:al. Solidarności, al. Sikorskiego i ul Gen. B. Ducha na skrzyżowanie dwupoziomowe z wyspą centralną, łącznicami i sygnalizacją świetlną w poziomie „0” (w ciągu ul. Gen. B. Ducha oraz al. Sikorskiego) oraz estakadą prowadzoną w ciągu al. Solidarności. Zakres rzeczowy inwestycji obejmuje m. in.: -budowę wiaduktu drogowego w ciągu al. Solidarności; -budowę skrzyżowania z wyspą centralną i sygnalizacją świetlną na przecięciu ulic: Gen. B.Ducha, al.Sikorskiego i al. Solidarności; -przebudowę al. Sikorskiego na odcinku niezbędnym dla wykonania włączenia do al. Solidarności; -przebudowę ul. Gen. B. Ducha na odcinku od al. Solidarności do ul. Poligonowej; -budowę skrzyżowania z sygnalizacją świetlną na skrzyżowaniu ul. Gen. B. Ducha i ul. Północnej; -przebudowę ul. Północnej na odcinku niezbędnym dla wykonania włączenia do ul Gen. B. Ducha; -budowę kładki dla pieszych nad al. Solidarności; -przebudowę i budowę chodników; -budowę ścieżek rowerowych; -przebudowę zatok autobusowych; -budowę urządzeń ochrony środowiska (np. ekrany akustyczne, kanalizacja deszczowa); -przebudowę i budowę urządzeń infrastruktury technicznej(m.in sygnalizacji świetlnej, oświetlenia) Produktami projektu będą: - Przebudowana droga krajowa nr 19 o łącznej dł. 1,05 km (w tym: al. Solidarności – 0,89 km, al. Sikorskiego – 0,16 km) - Przebudowana droga wojewódzka nr 809 (ul. Gen. B. Ducha) o dł. 0,44 km Głównymi użytkownikami projektu będą: -mieszkańcy Lublina i LOF; -mieszkańcy Województwa Lubelskiego i sąsiednich województw; -kierowcy samochodów osobowych w ruchu tranzytowym; -kierowcy zawodowi samochodów dostawczych i ciężarowych; -turyści odwiedzający Lublin. (Polish)
    0 references
    The project concerns the conversion of street junctions: al.Solidarity, al.Sikorski and ul.B. Dear at the intersection between two and two levels with the central island, the connection points and the traffic lights at ‘0’ level (within the course of ul.Gen.B. Ducha and al.Sikorski) and a estader maintained within al.Solidarity.The material scope of the investment includes, inter alia:— construction of road viaduct within al.Solidarity;Construction of the intersection with the central island and traffic lights at the intersection of the streets:Gen.B.Dcha, al.Sikorski et al.Solidarity;— reconstruction of al.Sikorski on the stretch necessary to carry out the inclusion in al.Solidarity;Reconstruction of ul.Gen.B. Duch in the section from al.Solidarity towards ul.Polygonowa;Construction of the intersection with traffic lights at the intersection ul.Gen.B. Duch and ul.North;Reconstruction of ul.North on the stretch necessary to implement the introduction to the ul.B. Duch;Construction of a footbridge over al.Solidarity;Reconstruction and building of pavements;Construction of cycle paths;— reconstruction of bus bays;Construction of environmental protection equipment (e.g. acoustic screens, storm water drainage);The reconstruction and construction of equipment for technical infrastructure (including light signalling, lighting) of the project will be:— Generated national road No 191.05 km (of which:al.Solidarity — 0.89 km, al.Sikorski — 0.16 km) — The reconstructed Provincial Road No 809 (ul.Gen.B. Duch) with the length of length0.44 km of the main project users will be:The residents of Lublin and the LOF;The inhabitants of Lubelskie Province and neighbouring provinces;— drivers of passenger cars in transit traffic;— drivers of professional vans and trucks;Visitors to Lublin. (English)
    0 references

    Identifiers

    POPW.02.02.00-06-0002/16
    0 references