Development of bidesks and industrial tables with improved ergonomic features (Q80027)

From EU Knowledge Graph
Revision as of 05:15, 23 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 369,128.3784 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of bidesks and industrial tables with improved ergonomic features
Project in Poland financed by DG Regio

    Statements

    0 references
    1,538,034.91 zloty
    0 references
    2,435,402.97 zloty
    0 references
    584,496.7128 Euro
    13 January 2020
    0 references
    63.15 percent
    0 references
    1 December 2017
    0 references
    31 December 2019
    0 references
    TECHMARK L. OGŁOZA S. ZDZIECHOWSKI SPÓŁKA JAWNA
    0 references
    0 references

    51°49'10.9"N, 19°18'12.6"E
    0 references
    Numer_referencyjny_programu_pomocowego: SA.41471(2015/X) Przeznaczenie_pomocy_publicznej: art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014). Celem projektu jest opracowanie innowacyjnych produktów w postaci biurek i stołów przemysłowych o ulepszonych właściwościach w obszarze ergonomii i komfortu oraz bezpieczeństwa dla użytkowania. Produkty te opierały się będą na nowej konstrukcji w tym opracowanych siłownikach liniowych, które pozwolą użytkownikom końcowym na pełne dostosowanie miejsca pracy i wygodną zmianę pozycji pracy w ciągu dnia w celu najmniejszego obciążenia układu kostna szkieletowego i redukcji innych negatywnych czynników związanych z m.in. siedzącym trybem pracy. Konstrukcje te dostosowane będą także do potrzeb osób z ograniczeniami ruchowymi. Innowacyjny produkt rozwiąże problemy i ograniczenia, jakie występują w obecnych wyrobach natury technicznej (ograniczenia wymiarowe związane z kształtami a także problemy związane ze stabilnością biurek i stołów z automatyczną regulacją wysokości), a także poszerzą możliwości w obszarze wzornictwa (np. różnorodna kolorystyka w tym dla poszczególnych kolumn. Projekt realizowany będzie w 5 etapach przez 21 miesięcy w okresie 01.09.2017 – 31.05.2019, W tym pierwsze 4 etapy dotyczą badań przemysłowych związanych z: - opracowaniem kolumn podnoszących zintegrowanych z siłownikami liniowymi - opracowaniem wzornictwa i konstrukcji poszczególnych elementów - opracowaniem poszczególnych komponentów i ich weryfikacją (parametry i cechy jakościowe) - integracją poszczególnych komponentów technologii i demonstracja prototypu w warunkach zbliżonych do rzeczywistych. Ostatni etap to prace rozwojowe, które zakładają sprawdzenie rezultatu w warunkach rzeczywistych i optymalizację uzyskanych rezultatów. Wszelkie kluczowe prace realizowane będą samodzielnie przez W (Polish)
    0 references
    Reference_reference_programme_aids:SA.41471 (2015/X) _public:Article 25 of Commission Regulation (EC) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in the application of Article 107 and 108 of the Treaty (OJ(OJ LEU L 187/1, 26.06.2014).The aim of the project is to develop innovative products in the form of a burette and industrial tables with improved ergonomic features and comfort and safety for use.These products will be based on new structures in that line, which will allow end-users to fully adjust their workplace and accommodate their position during the day in order to minimise skeletal strain and other negative factors associated with, inter alia, sedentary behaviour.These structures will also be adapted to the needs of people with reduced mobility.The innovative product will solve the problems and limitations in current products of technical nature (dimensional constraints associated with profiles as well as problems related to the stability of the desks and tables with automatic height adjustments), as well as the extension of possibilities in the field of design (for example, a variety of colours in this column.The project will be implemented in 5 stages for a period of 21 months in the period 01.09.2017 & sh;31.05.2019 The first 4 steps relate to industrial research related to:The development of columns to be integrated with the linear actuators — design and design of the different components — development of the different components and their verification (quality parameters and characteristics) — integration of the different components of the technology and demonstration of the prototype in real-world environments.The final step is the development work, which presupposes that results are checked in real terms and that the results obtained are optimised.All key work will be carried out on its own. (English)
    0 references

    Identifiers

    POIR.01.02.00-00-0103/17
    0 references