Continuation of the footpath for pedestrians and cyclists in ZábGreek Lhota (Q63287)

From EU Knowledge Graph
Revision as of 09:51, 28 August 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Continuation of the footpath for pedestrians and cyclists in ZábGreek Lhota
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,871,500.0 Czech koruna
    0 references
    74,860.0 Euro
    1 October 2020
    0 references
    1,970,000.0 Czech koruna
    0 references
    78,800.0 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    30 September 2020
    0 references
    Obec Zářecká Lhota
    0 references
    0 references

    50°0'15.8"N, 16°13'9.8"E
    0 references
    56501
    0 references
    Stavba stezky pro chodce a cyklisty je navržena v obci Zářecká Lhota (intravilán obce), na katastrálním území Zářecká Lhota (791024). Navržená stezka vede podél silnice II. třídy II/315 a začíná napojením na stávající cyklostezku vedoucí po pravé straně směrem od Chocně. Stezka končí sjezdem na účelovou komunikaci za obcí. Jedná se o výstavbu nové stezky pro chodce a cyklisty napojené na stávající stezku v obci Zářecká Lhota. (Czech)
    0 references
    The building of a bridge for pedestrians and cyclists is proposed in the municipality of ZáGreek Lhota (intra-regional Community), in the cadastral district Lhota (791024). The path proposed runs along the Class II road II/315 and starts with a connection to the current cycle path on the right, the head of the path from the right side of the road. The path ends with the running of a dedicated communication by the municipality. It concerns the construction of a new path for pedestrians and cyclists connected to the existing footpath in Zárum Lhota. (English)
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0009670
    0 references