RECONSTRUCTION AND ADAPTATION OF THE DEGRADED BUILDING OF THE FORMER SCHOOL IN THE TOWN OF KOCIERZA INTO SOCIAL HOUSING AND THE PROFESSIONAL ACTIVATION OF THE PERSONS COVERED BY THE SUPPORT. (Q102335)

From EU Knowledge Graph
Revision as of 08:17, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
RECONSTRUCTION AND ADAPTATION OF THE DEGRADED BUILDING OF THE FORMER SCHOOL IN THE TOWN OF KOCIERZA INTO SOCIAL HOUSING AND THE PROFESSIONAL ACTIVATION OF THE PERSONS COVERED BY THE SUPPORT.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,405,414.08 zloty
    0 references
    337,299.3792 Euro
    13 January 2020
    0 references
    1,756,987.23 zloty
    0 references
    421,676.94 Euro
    13 January 2020
    0 references
    79.99 percent
    0 references
    26 October 2016
    0 references
    30 July 2018
    0 references
    GMINA GOMUNICE
    0 references

    51°10'10.6"N, 19°29'7.8"E
    0 references
    Przedmiotem projektu „Przebudowa i adaptacja zdegradowanego budynku byłej szkoły w miejscowości Kocierzowy na mieszkania socjalne oraz aktywizacja zawodowa osób objętych wsparciem” jest przebudowa i zmiana sposobu użytkowania obiektu z przeznaczeniem na budynek mieszkalny, w którym udostępnionych zostanie 8 mieszkań socjalnych dla 13 użytkowników, w tym co najmniej jedno mieszkanie dostosowane do potrzeb osób niepełnosprawnych. Obecnie obiekt jest niszczejącym nienadającym się do użytkowania pustostanem. Integralną częścią inwestycji jest przeprowadzenie szkoleń z zakresu aktywizacji zawodowej dla 8 dorosłych osób objętych korzystających z powstałej infrastruktury. Projekt jest zatem realizowany w ścisłym powiązaniu z działaniami podejmowanymi w ramach wsparcia EFS. Celem głównym projektu jest wzrost poziomu dostępności i jakości usług społecznych ograniczających ubóstwo i wykluczenie społeczne w postaci stworzenia mieszkań socjalnych w miejscowości Kocierzowy na terenie Gminy Gomunice. W ramach inwestycji zrealizowanych zostanie 7 zadań, które przyczynią się do realizacji celu głównego. Przeprowadzone zostaną prace związane z przebudową i zmianą użytkowania zdegradowanego budynku (prace rozbiórkowe, prace stanu surowego, instalacje elektryczne i teleinformatyczne, instalacja odgromowa, na dachu ogniwa fotowoltaiczne, instalacja wodno-kanalizacyjna i biały montaż). Mieszkania przygotowane zostaną do zamieszkania przez odbiorców projektu: m.in. ogrzewanie podłogowe, podgrzewacz ciepłej wody użytkowej z zastosowaniem pompy ciepła. Każde mieszkanie zostanie wyposażone w elementy ruchome tj. szafka wraz z zlewozmywakiem i szafka z kuchenką elektryczną czteropalnikową. Na zewnętrz budynku wykonane zostaną prace ziemne. Przedsięwzięcie stanowi odpowiedź na problemy wynikające z przeprowadzonej analizy popytu i analizy otoczenia społeczno-gospodarczego, z jakimi boryka się Gmina Gomunice. Projekt zrealizowany zostanie od 25.10.2016 do 30.06.2018r. (Polish)
    0 references
    The subject of the project “Construction and adaptation of a degraded building of the former school in Koerrzowy to social housing and activation of the persons supported” is a modification and modification of the use of the facility for a residential building in which 8 social housing for 13 users will be made available, including at least one apartment tailored to the needs of disabled persons. The site is currently not suitable for use as an empty pad. An integral part of the investment is the provision of professional activation training for 8 adults who benefit from the infrastructure. The project is therefore being implemented in close connection with the activities undertaken in support of the ESF. The main aim of the project is to increase the level of accessibility and quality of social services which reduce poverty and social exclusion in the form of the creation of social housing in the municipality of Konin in the municipality of Municipality. The investment will carry out 7 tasks that will contribute to the main objective. Work will be carried out in connection with the alteration and alteration of the use of degraded buildings (demolition works, works of the crude state, electrical and electronic installations, lightning protection, photovoltaic installation, plumbing and white installation). They will be prepared to live by the recipients of the project: e.g. floor heating, hot water heater using a heat pump. Any apartment will be equipped with movable components, i.e. a cabinet with a sink and cabinet with a 4-smoker oven. The outdoor work of the building will be carried out on the ground. The project responds to the problems arising from the analysis of the demand and the socio-economic analysis that the Municipality of Municipality is facing. The project will be implemented from 25.10.2016 to 30.06.2018. (English)
    0 references

    Identifiers

    RPLD.07.03.00-10-0052/16
    0 references