ENERGY EFFICIENCY PROJECT FOR THE SIPLAST CNS PLANT (Q2074872)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY EFFICIENCY PROJECT FOR THE SIPLAST CNS PLANT |
Project in Italy financed by DG Regio |
Statements
74,700.0 Euro
0 references
149,400.0 Euro
0 references
50.0 percent
0 references
8 June 2018
0 references
29 March 2019
0 references
14 December 2018
0 references
SIAPLAST S.N.C. DI ANDRIOLLO O. E SILVESTRI F.
0 references
SIAPLAST SNC OPERA DA OLTRE 20 ANNI NEL SETTORE DELLO STAMPAGGIO E TRATTAMENTO DI MATERIE PLASTICHE E PRODOTTI AFFINI E, A SEGUITO DI UN'ANALISI DEI CONSUMI ENERGETICI, HA VALUTATO L'OPPORTUNITA' DI ADEGUARE LA STRUTTURA ALLE NUOVE TECNOLOGIE PER IL CONTENIMENTO DEI CONSUMI ENERGETICI E DELLE EMISSIONI DI GAS CLIMALTERANTI. ATTUALMENTE L'AZIENDA HA COME VETTORE PRIMARIO IN INGRESSO SOLO ENERGIA ELETTRICA CHE ALIMENTA MACCHINARI DI PRODUZIONE E SERVIZI AUSILIARI GENERALI, TRA CUI LA CLIMATIZZAZIONE DEGLI UFFICI (IL LABORATORIO NON E' RISCALDATO). L'INTERVENTO PROGETTATO A SEGUITO DI DE CONSISTE NELLA INSTALLAZIONE DI UNA NUOVA PRESSA AD ALTA EFFICIENZA PER LO STAMPAGGIO, GARANTENDO MINOR CONSUMO DI ENERGIA ELETTRICA E AUMENTO DI PRODUTTIVITA', CON CONSEGUENTE RIDUZIONE DEI CONSUMI SPECIFICI. IL PROGETTO PREVEDE INOLTRE L'INSTALLAZIONE DI UN IMPIANTO DI TRIGENERAZIONE PER LA PRODUZIONE DI ENERGIA ELETTRICA, TERMICA E FRIGORIFERA ATTRAVERSO L'IMPIEGO DI GAS COME FONTE PRIMARIA; IL CALOR (Italian)
0 references
SIAPLAST SNC HAS BEEN OPERATING FOR MORE THAN 20 YEARS IN THE AREA OF THE STAMPING AND TREATMENT OF PLASTICS AND RELATED PRODUCTS AND, AS A RESULT OF AN ANALYSIS OF ENERGY CONSUMPTION, IT HAS ASSESSED THE NEED TO ADAPT THE STRUCTURE TO NEW TECHNOLOGIES TO LIMIT ENERGY CONSUMPTION AND GREENHOUSE GAS EMISSIONS. THE COMPANY CURRENTLY HAS AS THE PRIMARY CARRIER ONLY ELECTRICITY THAT FEEDS MACHINERY OF PRODUCTION AND GENERAL AUXILIARY SERVICES, INCLUDING OFFICE SPACE (THE LABORATORY IS NOT HEATED). THE PLANNED INTERVENTION CONSISTS OF THE INSTALLATION OF A NEW HIGH EFFICIENCY PRESS FOR MOULDING, ENSURING LESS ELECTRIC ENERGY CONSUMPTION AND THE INCREASE OF PRODUTTIVITA ', THUS REDUCING SPECIFIC CONSUMPTION. THE PROJECT ALSO PROVIDES FOR THE INSTALLATION OF A TRIGENERATION PLANT FOR THE PRODUCTION OF ELECTRICITY, HEATING AND COOLING THROUGH THE USE OF GAS AS A PRIMARY SOURCE; CALOR (English)
0 references
Identifiers
B47B18000060009
0 references