IMPROVING THE EFFICIENCY OF MEDICAL SERVICES IN THE DISTRICT HOSPITAL IN POLISH OPOLE, THROUGH THE MODERNISATION OF THE INTERNAL BRANCH TOGETHER WITH THE SUPPLY OF EQUIPMENT (Q115666)

From EU Knowledge Graph
Revision as of 04:31, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
IMPROVING THE EFFICIENCY OF MEDICAL SERVICES IN THE DISTRICT HOSPITAL IN POLISH OPOLE, THROUGH THE MODERNISATION OF THE INTERNAL BRANCH TOGETHER WITH THE SUPPLY OF EQUIPMENT
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    3,508,625.33 zloty
    0 references
    842,070.0792 Euro
    13 January 2020
    0 references
    4,127,794.56 zloty
    0 references
    990,670.6943999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2019
    0 references
    30 September 2020
    0 references
    SZPITAL POWIATOWY IM. PRAŁATA J. GLOWATZKIEGO W STRZELCACH OPOLSKICH
    0 references
    0 references

    50°30'39.2"N, 18°18'1.8"E
    0 references
    Przedmiotem projektu będzie modern. i zakup sprzętu na Odd. Wew. (sprzęt jest w zał. 5). 8 sal będzie miało dostęp do własnych łazienek, pozostałych 5 sal będzie miała dostęp aż do czterech łazienek ogólnodostępnych. 2 sale jednoosobowe będą mogły pełnić funkcję izolatek.Oddz. zostanie usytuowany na 1 poziomie - 3 piętrze, gdyż dotychczas dwa odcinki znajdowały się na 3 i 2 piętrze. Prace bud. będą się odbywały pod nadz. inspekt nadzoru z branż budowlanej, elektrycznej i instalacyjnej. Liczba łóżek ulegnie zmniejszeniu z 55 na 44 ale nowoczesne metody leczenia możliwe do wdrożenia dzięki zakupowi nowego i wymianie zużytego sprzętu pozwolą na skrócenie czasu hospitalizacji, większą przelotowość przy zachowaniu obecnej liczby hospitalizacji. Poprawi się ergonomia pracy personelu i warunki bytowe pacjentów (2 otwarte konsole pielęg. z pokojami przygotowawczymi, dwa pokoje badań, dwa zmoderniz. brudowniki, sale z łazien., mniejsza liczba łóżek, telemetria itp.).Liczba personelu nie ulegnie zwiększeniu,będzie optymal. wobec zwiększ. obciążenia pacjen. w ciężkich st. chorob. Poprawie ulegną metody leczenia cukrzycy, dzięki kontrolowanej insulinot.Przewiduje się realiz. nowych świad. takich jak nieinwaz. wentyl. mech. Obniżą się koszty hospital.,bo skrócony zostanie czas hospital., a dzięki nieinwaz. respiratorom, pacjenci unikną drogiej hospital. na OAiIT. Także pacjencji z OAiIT będą mogli korzystać z tych respirat., zwalniając jednocześnie cenne łóżko na OIiT. W projekcie uwzględ. promocję. Lokalizacja;IIIp. Szpitala Powiatowego w Strzelcach Opolskich, ul. Opolska 36A.Bud. ma charak. zabytk (wpisany do Gminnej Ewiden Zabyt.).Produkty: Liczba wspartych podmiotów leczniczych: 1; Nakłady inwestycyjne na aparaturę medyczną: 1.146.362,76; liczba szpitali objętych wsparciem w programie świadczącym usługi zdrow. - 1. Projekt jest zgodny z Mapą Potrz. Zdrow. Woj. Opol.dla lecznict. szpit. (o. wewn.)Usługi będą świadczone na rzecz osób starszych, z wykorzystaniem zak. sprzętu. (Polish)
    0 references
    The object of the project will be the purchase of equipment and equipment for the Oder. Inside (the equipment is enclosed. EUR 5). 8 rooms will have access to their own bathroom, the remaining 5 rooms will have access to four bathrooms. 2 one-person rooms will be able to perform the function of Isolatex, and will be located on the 1-3 floor, as the two sections so far have been on the 3th and 2th floor. The construction works will be carried out under the supervision of the monitoring inspection of the construction, electrical and installation sectors. The number of beds will decrease from 55 to 44, but modern methods of treatment can be implemented through the purchase of new equipment and the replacement of waste equipment, with a reduction in hospitalisation time, greater capacity for hospitalisation, while keeping the current number of hospitalisation. It will improve the ergonomics of staff and the living conditions of patients (2 open feeding consoles with preparatory rooms, two test rooms, two upgrades. brims, lounges, less beds, telemetry, etc.).The number of personnel will not increase, will be optimised in view of the increased burden on the patient. Diabetes treatment methods will be improved through controlled insulin. The costs of the asset boom will be reduced, because the period of the administration of hospital is shortened and, thanks to the invaders, patients are unique to the OAiIT. The patients from OAiIT will also be able to benefit from these reorganisations, while at the same time releasing the precious bed at the Oiet. The project takes the promotion into account. Location; IIIp. District Hospital in Opole, ul. Opole 36A.Bud. has a chaos. Number of healthcare establishments supported: 1; Investment in medical equipment: 1.146.362,76; number of hospital supported hospitals. TO 1. IS SATISFIED. The project is in line with the MRZ. (4). Woj. Dull. (ext.) Services will be provided to older people, making use of equipment. (English)
    0 references

    Identifiers

    RPOP.10.01.01-16-0048/17
    0 references