(10360.14072017.115000071) 05.18_3053_ILBORO (Q2056991)

From EU Knowledge Graph
Revision as of 03:27, 17 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000071) 05.18_3053_ILBORO
Project in Italy financed by DG Regio

    Statements

    0 references
    107,143.82 Euro
    0 references
    310,561.79 Euro
    0 references
    34.5 percent
    0 references
    1 January 2018
    0 references
    23 March 2020
    0 references
    31 March 2020
    0 references
    COMUNE DI PRATO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN ALLUMINIO, A TAGLIO TERMICO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW ELT; 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEI C.D. ?PONTI TERMICI? PREVEDENDO QUINDI ANCHE LA SOSTITUZIONE DELLE ATTUALI SOGLIE CON NUOVE SOGLIE A TAGLIO TERMICO. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N ELT; 0,35.- ISOLAMENTO TERMICO STRUTTURE ORIZZONTALI E VERTICALI: LUNGO GLI (Italian)
    0 references
    IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English)
    0 references

    Identifiers