Thermal modernisation of public buildings in the Municipality of Szaniec. (Q100302)

From EU Knowledge Graph
Revision as of 04:51, 16 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of public buildings in the Municipality of Szaniec.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,794,401.2 zloty
    0 references
    430,656.288 Euro
    13 January 2020
    0 references
    2,111,060.28 zloty
    0 references
    506,654.47 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 April 2017
    0 references
    31 December 2019
    0 references
    GMINA SZCZANIEC
    0 references

    52°16'9.5"N, 15°41'7.8"E
    0 references
    Przedmiotem projektu jest głęboka termomodernizacja bud. użyt. publ. w m. Szczaniec: budynek remizy OSP, budynek wykorzystywany do działalności społecznej, budynek przedszkola-przychodni. Projekt obejmuje: ocieplenie przegród poz. i pion.; wymiana okien i/lub drzwi zew.; modern. instalacji c.o. i/lub c.w.u. z wymianą źr. ciepła; zastosowanie wentylacji nawiewno-wywiewnej z odzyskiem ciepła oraz chłodzenia pasywnego, modern. ośw. na LED; montaż inst. fotowoltaicznej i ogrzewania OZE (pomp ciepła w każdym z bud. i dodatkowo kotła na biomasę w Przedszkolu); urządzenia i elektronika systemu zarządzania energią. Gr. docelowe: mieszkańcy G. Szczaniec; użytkownicy budynków: społecznego, OSP, przedszkola; władze G. Szczaniec; intytucje systemu ochrony środ. Gł. cel proj.:Poprawa efektywności energetycznej w sektorze budynków użyteczności publicznej na obszarze G. Szczaniec poprzez optymalizację gospodarki energetycznej w obiektach publicznych w m. Szczaniec. Cele szczeg.:Zmniejszenie zapotrzebowania na energię pierwotną; Redukcja emisji CO; Optymalizacja zużycia e. elektrycznej; Zwiększenie wykorzystania OZE. W. produktu: L. zmodern. energetycznie bud.: 3 szt. Dod. zdolność wytw. e. cieplnej ze źr. odn.: 0,05 MWt Dod. zdolność wytw. e. elektrycznej ze źr. odn.: 0,02 MWe L. podm. wykorzystujących techn. informacyjno-komunikacyjne: 3 szt. L. wyb. jedn. wytw. e. cieplnej z OZE: 3 szt. L. wyb. jedn. wytw. e. elektrycznej z OZE: 3 szt. L. zmodern. źr. ciepła: 3 Szt. Pow. użytkowa bud. poddanych termomodern.: 1291,98 mkw Udz. proj. w odn. do obszaru objętego programem rewitalizacji: 0,69% W. rezultatu: Szac. roczny spadek emisji g. ciepl. (CI 34): 220,59 tony równoważnika CO2/rok Zmn. rocznego zużycia e. pierwotnej w bud. publ.(CI 32): 711 975,98 kWh/rok Il. zaoszcz. e. cieplnej: 2136,00 GJ/rok Il. zaoszcz. e. elektrycznej: 5,87 MWh/rok Zmn. zużycia e. końcowej w wyniku real. proj.: 2136,00 GJ/rok Wzr. zatr.: 1 EPC Wzr. zatr.– kobiety: 0 EPC Wzr. zatr.- mężczyźni: 1 EPC[...] (Polish)
    0 references
    The subject of the project is the deep renovation of the construction of put. used in pul. the TSO’s return building, a building used for social activities, a kindergarten building. The project includes: the warming of the partitions of the compartment and the division; replacement of windows and/or doors; distracting heaters and/or hot service hot water equipment; the use of exhaust ventilation with thermal recovery and cooling of passive heating and cooling; installation of the renewable energy photovoltaic and heating system (heat pumps for each construction and, in addition, a biomass boiler in a pre-school); energy management equipment and electronics. GR. target: residents of G. Szlaniec; users of buildings: social, TSO, kindergartens; authorities G. Szaniec; Title of the system of protection of the system. Aim: improve energy efficiency in the public buildings sector in the area of G. Szceciec by optimising the energy economy in public buildings in the road. A reduction in demand for primary energy; Reduction of CO emissions; Optimisation of electric consumption; Increased use of RES. The product: L. energy budget: 3 units Alternative heat output from pupil (s): 0,05 MWt. electrical function: 0,02 MWe of the following information and communication technology: 3 units B. Heat e from RES: 3 units Other RES electricity: 3 units L. of moderation of heat: 3 unit. Formulation of the building. 1 291.98 mm in the regeneration programme area: 0.69 % W. result: Estimated annual reduction in emissions of g. (CI 34): 220,59 tonnes CO2/rok of annual primary consumption in public pul. (CI 32): 711 975.98 kWh/year 2136,00 GJ/year Quantities saved. 5.87 MWh/year of consumption. final as a result of the action. 2136,00 GJ/year 1 EPC Standard for women: 0 EPC Standard for men: 1 FTE [...] (English)
    0 references

    Identifiers

    RPLB.03.02.01-08-0017/18
    0 references