Construction of biomass heat plants at LESS & ENERGY s.r.o. in Dlouhá Vsi (Q15341)

From EU Knowledge Graph
Revision as of 23:37, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction of biomass heat plants at LESS & ENERGY s.r.o. in Dlouhá Vsi
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    7,810,492.08 Czech koruna
    0 references
    312,419.6832 Euro
    10 January 2020
    0 references
    13,017,486.8 Czech koruna
    0 references
    520,699.47200000007 Euro
    10 January 2020
    0 references
    60 percent
    0 references
    21 April 2017
    0 references
    25 April 2018
    0 references
    30 April 2018
    0 references
    LESS & ENERGY s.r.o.
    0 references
    0 references

    49°53'18.89"N, 15°23'7.22"E
    0 references
    28601
    0 references
    V rámci projektu dojde k výstavbě kotelny a instalaci kotle o tepelném výkonu 800 kW. Jako surovina pro tento kotel bude sloužit odpadní hnědá štěpka z procesu odkornění dřevozpracujícího podniku LESS & TIMBER, a.s., který bude zároveň odběratelem vyrobeného tepla. Realizací projektu dojde k výraznému omezení škodlivých emisí do ovzduší. a. (Czech)
    0 references
    The project will build a boiler and installation of a boiler with a heat output of 800 kW. The raw material for this boiler will be waste brown chips from the process of debarking the wood company, LESS & Timer, a.s., which will at the same time be a purchaser of the produced heat. The implementation of the project will lead to a significant reduction of harmful emissions in the air. (English)
    0 references

    Identifiers

    CZ.01.3.09/0.0/0.0/16_130/0009806
    0 references