Construction of the S1 express road. Pyrzowice (W) — Podwarpie (Q85938)

From EU Knowledge Graph
Revision as of 20:54, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S1 express road. Pyrzowice (W) — Podwarpie
Project in Poland financed by DG Regio

    Statements

    0 references
    74,445,971.69 zloty
    0 references
    17,867,033.205599997 Euro
    13 January 2020
    0 references
    87,583,496.11 zloty
    0 references
    21,020,039.07 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    50°26'38.8"N, 19°7'26.8"E
    0 references

    50°28'15.6"N, 19°13'54.8"E
    0 references
    Przedmiotem niniejszego projektu jest dobudowa drugiej jezdni drogi ekspresowej S1 na odcinku węzeł „Lotnisko” – węzeł „Podwarpie” od km 2+158 do km 11+880 tj. o długości 9,72 km wraz z budową obiektów inżynierskich, urządzeń ochrony środowiska, urządzeń związanych z drogą (odwodnienie, oświetlenie drogowe) oraz przebudową istniejącej infrastruktury technicznej. Droga ekspresowa S1 funkcjonuje w chwili obecnej na ww. odcinku jako jednojezdniowa droga ekspresowa tj. ruch pojazdów odbywa się dwukierunkowo na jednej jezdni drogi ekspresowej, zrealizowanej w latach 2002-2005. Początek projektu zlokalizowany jest na terenie gminy Mierzęcice, za węzłem „Lotnisko” w km 2+158. Koniec opracowania zlokalizowany jest na terenie gminy Siewierz, przed istniejącym węzłem „Podwarpie” w km 11+880. Poprzez ścisłe dopasowanie sytuacyjno – wysokościowe do jezdni istniejącej drogi ekspresowej, projektowana jezdnia S1 nie wprowadza istotnych zmian w obecnym krajobrazie. (Polish)
    0 references
    The object of this project is a second carriageway of the S1 expressway, along the section ‘Lotnisko’ interchange — ‘Podwarpie’ interchange from km 2 + 158 to km 11 + 880, i.e. 9.72 km long with the construction of engineering structures, environmental equipment, road lighting equipment (drainage, road lighting) and the construction of the existing technical infrastructure.The expressway S1 operates at present on the above section as a single-carriageway express road, i.e. vehicle traffic is carried out in two directions on one carriageway of an express road, achieved in the period 2002-2005.The start of the project is located in the Municipality of the Municipality, as a node “Lotnisko” at km 2 + 158.The end of the study is located in the municipality of Siewierz in front of the existing ‘Podwarpie’ node in km 11 + 880.By closely matching the situation of high altitude to the carriageway of the existing expressway, the planned S1 road does not make any significant changes in the current landscape. (English)
    0 references

    Identifiers

    POIS.04.01.00-00-0013/19
    0 references