PROVISION OF SPECIFIC EQUIPMENT FOR RIPOK EQUIPMENT IN ŚWIĘTAJNIE (Q132473)

From EU Knowledge Graph
Revision as of 17:50, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
PROVISION OF SPECIFIC EQUIPMENT FOR RIPOK EQUIPMENT IN ŚWIĘTAJNIE
Project in Poland financed by DG Regio

    Statements

    0 references
    616,114.07 zloty
    0 references
    147,867.37679999997 Euro
    13 January 2020
    0 references
    724,840.08 zloty
    0 references
    173,961.62 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 February 2018
    0 references
    31 August 2019
    0 references
    DBAJ MARTA PRYCHODKO
    0 references
    0 references

    53°33'55.4"N, 21°13'4.8"E
    0 references
    Planowane przedsięw. dot.odzysku i recyklingu odpad. biodegradowalnych w region.instalacji do przetw.odpadów komunalnych w Świętajnie w Reg.Centr.wg podziału w WPGO. Inwestycja zlokal.jest na działce ewid.oznacz. o nr 77/1, obr.0014 Świętajno. Na jej terenie znajdują się już obiekty związane z działal.Wnioskodawcy. Planowane przedsięw.polegać będzie na zakupie specjalist.sprzętu do prowadzenia efektywnej gospodarki odpadami w zakresie odzysku i recyklingu odpad. biodegradowalnych. Przetwarz.odpad. prowadz.będzie w instalacji do kompost.komunal. osadów ściekow. oraz bioodpadów, w której wytwarzany będzie produkt w postaci granulatu o właściwościach nawozowych, prowadzonej w technologii VAL’ID, wyposażona w zamknięty system odprowadz.odcieków. Projekt zakł.wyłącznie zakup specjalist.urządzeń niezbęd. do prowadz.działal. podstaw. Ma więc charak. nieinfrastrukturalny. W ramach przedsięw.przewiduje się: zakup środk.trw.–maszyn i urządzeń do prowadz. i optymaliz.procesów odzysku i recyklingu odpad.bio, w tym kontenerów, rozrzutnika, przyczepy, zamiatarki oraz wozu asenizacyjnego. Będzie możliwe: efektywniejsze przetwarz.bioodpadów, w tym lepsze rozdrabnianie i mieszanie W efekcie nastąpi poprawa jakości kompostu i zwiększenie możliwości przetwarz.różnych rodzajów bioodpadów w ramach instalacji. Do przetwarz.będą wykorzyst. bioodpady w ilości do 3000Mg/rok. Projekt wpisuje się zatem w cel temat. 6 Zach.i ochr. środow.przyrodn. oraz wspier. efektyw. gospod.zasobami, Prior inwest. 6a – Inwest.w sektor gosp.odpad. celem wypełn. zobowiązań określ.w dorobku praw.Unii w zakresie środ. oraz zaspok. wykraczaj.poza te zobowiąz.potrzeb inwest., określ.przez państ.członk. SzOOP RPO WiM Dz.5.1 Gosp.odpad. Wskaźniki: rezult.: Moc przer.zakł. zagospod.odpadów [Mg/rok]–3000Mg/rok; prod: Licz. wspartych zakł.zagospod. odpadów [szt.]–1szt. (Polish)
    0 references
    Planned aid for recovery and recycling. biodegradable in regions. municipal waste facilities in Reg.Century, broken down by WPGO. The location of an investment is located in a clearly identified plot of concern No 77/1, n.o., 0014 Świętajno. There are already establishments on the site. Planned operations will be based on the purchase of specialised waste recovery and recycling equipment for the efficient management of waste. Will be carried out at the facility to the composting plant (s) of the sewage sludge plant (s) and of bio-waste where the product will be produced in the form of a pellet with fertilising qualities, which is carried out in the VAL of a’ID technology, equipped with a closed system of leachates. The establishment of the establishment is based solely on the purchase of the equipment necessary for the operation of the plant to be carried out. Therefore, it’s not an infrastructure. The following are foreseen in the course of the business: the purchase of machinery and equipment for moving and optimising the recovery and recycling of waste, including containers, switches, trailers, sweepers and slurry tankers. It will be possible to: more efficient processing of bio-waste, including better shredding and mixing. as a result, there will be improvements in the quality of compost and improved possibilities for the production of different types of bio-waste within the installation. Bio-waste of up to 3000 tonnes/year. The project is therefore part of the subject matter. 6 Means of nature and operations to be carried out in a natural environment, Primor investment. 6a — An investment in the commercial sector with a view to complying with the obligations laid down in the Union acquis relating to measures relating to measures and to meet the requirements laid down therein. SZOOP ROP WiM dzon.5.1 Gosp.kw. Indicators: result: Cut-out force [Mg/year] — 3000 tonnes/year; PROD: Number of waste [units] — 1 t. (English)
    0 references

    Identifiers

    RPWM.05.01.00-28-0004/18
    0 references