CONSOLIDATION WORKS UPSTREAM OF BUILT-UP AREAS (Q2051756)

From EU Knowledge Graph
Revision as of 16:05, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
CONSOLIDATION WORKS UPSTREAM OF BUILT-UP AREAS
Project in Italy financed by DG Regio

    Statements

    0 references
    250,000.0 Euro
    0 references
    500,000.0 Euro
    0 references
    50.0 percent
    0 references
    30 June 2017
    0 references
    30 December 2019
    0 references
    COMUNE DI URZULEI
    0 references
    0 references
    0 references

    40°5'36.02"N, 9°30'28.98"E
    0 references
    IL PROGETTO HA L¿OBIETTIVO DI METTERE IN SICUREZZA ALCUNI VERSANTI A MONTE DELL¿ABITATO DI URZULEI MEDIANTE L¿INSTALLAZIONE DI NUOVE BARRIERE PARAMASSI, LA REALIZZAZIONE DI UN SISTEMA DI RACCOLTA DELLE ACQUE BIANCHE E IL DISGAGGIO E LA STABILIZZAZIONE DI MASSI. È PREVISTA INOLTRE LA SISTEMAZIONE DEL RIO SA PEDRA LADA E IL RIFACIMENTO DELL¿ATTRAVERSAMENTO DEL RIO NURALÊ SULLA VIA SASSARI. (Italian)
    0 references
    THE OBJECTIVE OF THIS PROJECT WAS TO MAKE SURE THAT A NUMBER OF SLOPES UPSTREAM OF THE BUILT-UP AREA OF URZUZLEI WILL BE PUT IN SAFETY THROUGH THE CREATION OF NEW ANCHOR BARRIERS, THE IMPLEMENTATION OF A WHITE WATER COLLECTION SYSTEM AND THE DISGAGGIO AND THE STABILISATION OF ROCKS. IT WILL ALSO PROVIDE FOR THE ACCOMMODATION OF RIO SA PEDRA LADA AND THE OVERHAUL OF THE RIO URARALÊ OVER THE ROUTE OF SASSARI. (English)
    0 references

    Identifiers