PRIMARY SCHOOL CARLO COLLODI (MUNICIPALITY OF STIMIGLIANO) (Q2035091)

From EU Knowledge Graph
Revision as of 13:27, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
PRIMARY SCHOOL CARLO COLLODI (MUNICIPALITY OF STIMIGLIANO)
Project in Italy financed by DG Regio

    Statements

    0 references
    148,511.0 Euro
    0 references
    297,022.0 Euro
    0 references
    50.0 percent
    0 references
    30 May 2017
    0 references
    9 February 2019
    0 references
    COMUNE DI STIMIGLIANO
    0 references
    0 references
    0 references

    42°17'57.59"N, 12°33'56.63"E
    0 references
    SOSTITUZIONE DELLA CALDAIA ESISTENTE CON CALDAIA MODULARE A CONDENSAZIONE, INSTALLAZIONE DI TESTE TERMOSTATICHE E SOSTITUZIONE DEI RADIATORI IN GHISA CON RADIATORI IN ALLUMINIO,ISOLAMENTO TERMICO A CAPPOTTO,INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO (Italian)
    0 references
    REPLACEMENT OF THE EXISTING BOILER BY MODULAR CONDENSING BOILER, INSTALLATION OF THERMOSTATICALLY CONTROLLED HEADS AND REPLACEMENT OF CAST IRON RADIATORS WITH ALUMINIUM RADIATORS; (English)
    0 references

    Identifiers

    C86J17000330002
    0 references